• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

Api 577 Questions And Answers

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

API 577 QUESTIONS AND ANSWERS

Vista previa del contenido

API 577 QUESTIONS AND ANSWERS

Which of the following should be assessed as part of the welding quality control?

A. Welder performance in a qualified laboratory.
B. Welding equipment manufacturer is recognized by the Code of construction.
C. Welding symbols and weld sizes. - Answers - C. Welding symbols and weld sizes. *
4.2.1.1 (a)

Before welding starts the inspector should review______________________.

A. AWS D1.1
B. Codes and Standards
C. Welder's work histories - Answers - B. Codes and Standards * 4.2.1

List the four potential inspector actions associated with tasks prior to welding.

A._________________________________________________
B._________________________________________________
C._________________________________________________
D._________________________________________________ - Answers - a. Identify
and clarify missing details and information. *4.2.1.2 (a)
b. Identify and clarify missing weld sizes, dimensions, tests, and any additional
requirements. *4.2.1.2 (b)
c. Identify and clarify inconsistencies with standards, codes and specification
requirements. *4.2.1.2 (c)
d. Highlight potential weld problems not addressed in the design. *4.2.1.2 (d)

As part of a welding review the inspector must determine the competency of the welding
organization and the competency of the ___________________.

A. design engineer
B. welding foreman
C. inspection organization - Answers - C. inspection organization * 4.2.2.1 (a)

Name three items that the inspector must assure are in order before accepting NDE
procedures.

A.___________________________________________________________
B.___________________________________________________________
C.___________________________________________________________ - Answers
- a. NDE examiners are properly certified for the NDE technique (see 4.6) *4.2.4.1 (a)
b. NDE procedures are current and accurate. *4.2.4.1 (b)
c. Calibration of NDE equipment is current. *4.2.4.1 (c)

, As regards storage ovens for welding consumables the inspector should confirm that
the ovens have ______________________________.

A. current calibration stickers
B. a window for viewing the contents of the oven.
C. automatic heat controls - Answers - C. automatic heat controls *4.2.5.1 (c)

List the four issues that must be addressed when reviewing proposed heat treatment
and pressure tests.

A. ___________________________________________________________
B. ___________________________________________________________
C. ___________________________________________________________
D. ___________________________________________________________ -
Answers - a. Heat treatment procedure is available and appropriate (see 10.6).
*4.2.6.1 (a)
b. Pressure testing procedures are available and detail test requirements. *4.2.6.1 (b)
c. PWHT equipment calibration is current. *4.2.6.1 (c)
d. Pressure testing equipment and gauges calibrated and meet appropriate test
requirements. *4.2.6.1 (d)

All filler metals, base materials, and backing rings materials should be properly marked
and identified. What additional step might be required to insure proper materials? -
Answers - if required, perform PMI to verify the material composition. *4.2.7

Preheat is often applied prior to welding; sometimes it may also be needed
for_____________.

A. bending pipe
B. thermal cutting
C. popping off scale in single vee welds - Answers - B. thermal cutting *4.2.8.1 (b)

One item often forgotten during the review of welding consumables is looking for the
_______________.

A. name of the manufacturer of the consumable on the Welding Procedure
B. type of water cooling used for a GTAW torch
C. gas composition and purity requirements - Answers - C. gas composition and purity
requirements *4.2.10.1 (g)

. Normally quality assurance and quality control measures include such things as welder
responsibility, welder qualification, and the welder understanding the requirements of
the WPS and inspection hold points. What else might be required to help the welder
perform the weld? - Answers - Special training and mock-up weldments performed if
required. *4.3.1.1 (d)

Información del documento

Subido en
11 de julio de 2025
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA
3.8
(372)
Vendido
2202
Seguidores
1450
Artículos
62096
Última venta
3 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes