While the IC orders and approves resource orders, who else
has the authority to order incident resources?
a) Logistics Section Chief
b) Supply Unit Leader
c) Ordering Manager
d) All of the above - <<<Answers>>>>d) All of the above
When ordering resources, what type of ordering method is
best when the IC needs to order specialized private-sector
cleanup equipment for a hazardous materials incident?
a) single-point ordering
b) multi-point ordering
c) agency ordering
d) mutual aid ordering - <<<Answers>>>>b) multi-point
ordering
A/An is a rostered group of ICS-qualified personnel
consisting of an IC, other incident leadership, and personnel
qualified for other key ICS positions.
, a) Incident Management Team
b) Unified Command
c) Single Incident Commander
d) Incident Command System - <<<Answers>>>>a) Incident
Management Team
When should the evaluation of personnel resources occur?
a) once the resource is back at their home job
b) only after tactical objectives are achieved
c) before the after-action report
d) ongoing throughout the incident - <<<Answers>>>>d)
ongoing throughout the incident
Failure at the level is likely to reflect a failure to
appropriately manage the resource during the planning
process.
a) operational
b) logistical
c) initial response
d) tactical - <<<Answers>>>>d) tactical
How can you ensure a safe, controlled, and cost-effective
demobilization?
a) follow the IAP
100% Correct Answers Latest Update 2025
Top Rated A+
While the IC orders and approves resource orders, who else
has the authority to order incident resources?
a) Logistics Section Chief
b) Supply Unit Leader
c) Ordering Manager
d) All of the above - <<<Answers>>>>d) All of the above
When ordering resources, what type of ordering method is
best when the IC needs to order specialized private-sector
cleanup equipment for a hazardous materials incident?
a) single-point ordering
b) multi-point ordering
c) agency ordering
d) mutual aid ordering - <<<Answers>>>>b) multi-point
ordering
A/An is a rostered group of ICS-qualified personnel
consisting of an IC, other incident leadership, and personnel
qualified for other key ICS positions.
, a) Incident Management Team
b) Unified Command
c) Single Incident Commander
d) Incident Command System - <<<Answers>>>>a) Incident
Management Team
When should the evaluation of personnel resources occur?
a) once the resource is back at their home job
b) only after tactical objectives are achieved
c) before the after-action report
d) ongoing throughout the incident - <<<Answers>>>>d)
ongoing throughout the incident
Failure at the level is likely to reflect a failure to
appropriately manage the resource during the planning
process.
a) operational
b) logistical
c) initial response
d) tactical - <<<Answers>>>>d) tactical
How can you ensure a safe, controlled, and cost-effective
demobilization?
a) follow the IAP