• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 1 fuera de 4 páginas
Examen

Fdot Final Estimates - Level 1 Exam Q&A

Document preview thumbnail
Vista previa 1 fuera de 4 páginas

FDOT FINAL ESTIMATES - LEVEL 1 EXAM Q&A Between Printings of the standard specifications, what does the department publish to identify and describe changes in the specifications? - Answer-Change Orders Completed sets of final plans should be: - Answer-Bound together in the order shown on the key sheet & Submitted to the district with the final estimates package. Which of the items listed below is NOT included in the Final Estimates package? - Answer-Density log books What is placed on the plan sheets to call particular attention to unusual conditions? - Answer-Plan Notes What would you use to document field changes in the plans? - Answer-Black ball point pen & Black pencil What is the basis for payment of final quantities? - Answer-Site Source records What software is available for calculation final pa quantities? - Answer-Engineering Menu According to the standard weight table, what is the TOTAL weight of the following quantities of bolts? - Answer-1,472 Ibs Which of the following documents are used for reviewing contract time charges before clearing estimates for final payment? - Answer-Construction Diaries It is usually necessary to measure items, which are to be paid for on a lump sum or "plan quantity" basis. - Answer-FALSE On the transmittal letter, how should field books be listed? - Answer-Book number & description of contents What is the rea of the sodded section shown below? - Answer-11,241 SY When a pay item is based on truck capacity and side boards have been added to the truck body, what should you submit with the final estimates package? - Answer-Sketches of truck measurements Examples of site source records include: - Answer-Field books, tally sheets asphalt reports, latitude & department While on aa metric project, what method would be used to document final measured items in the field for site source record documentation. - Answer-Use only metric measuring devices, no conversion is allowed What two types of Estimates are needed to pay for the work performed by contractors? - Answer-Final & Progress Monthly In case of discrepancies among the contract documents, which document takes the highest precedence? - Answer-Special Provisions Contractors Recieve progress payments on the basis of? - Answer-Monthly Progress Estimates

Vista previa del contenido

FDOT FINAL ESTIMATES - LEVEL 1
EXAM Q&A
Between Printings of the standard specifications, what does the department publish to
identify and describe changes in the specifications? - Answer-Change Orders

Completed sets of final plans should be: - Answer-Bound together in the order shown
on the key sheet & Submitted to the district with the final estimates package.

Which of the items listed below is NOT included in the Final Estimates package? -
Answer-Density log books

What is placed on the plan sheets to call particular attention to unusual conditions? -
Answer-Plan Notes

What would you use to document field changes in the plans? - Answer-Black ball point
pen & Black pencil

What is the basis for payment of final quantities? - Answer-Site Source records

What software is available for calculation final pa quantities? - Answer-Engineering
Menu

According to the standard weight table, what is the TOTAL weight of the following
quantities of bolts? - Answer-1,472 Ibs

Which of the following documents are used for reviewing contract time charges before
clearing estimates for final payment? - Answer-Construction Diaries

It is usually necessary to measure items, which are to be paid for on a lump sum or
"plan quantity" basis. - Answer-FALSE

On the transmittal letter, how should field books be listed? - Answer-Book number &
description of contents

What is the rea of the sodded section shown below? - Answer-11,241 SY

When a pay item is based on truck capacity and side boards have been added to the
truck body, what should you submit with the final estimates package? - Answer-
Sketches of truck measurements

Examples of site source records include: - Answer-Field books, tally sheets asphalt
reports, latitude & department

Información del documento

Subido en
9 de julio de 2025
Número de páginas
4
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Freshy
3.6
(11)
Vendido
64
Seguidores
4
Artículos
6964
Última venta
2 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes