Examen

CSLB Practice Test With Complete Solutions.

Document preview thumbnail
Vista previa 3 fuera de 17 páginas

CSLB Practice Test With Complete Solutions. 1. The costs of running your business, including office expenses, etc., is called: a. Direct Costs b. Overhead c. A liability d. Accrual 2. Which government agency collects State Unemploy- ment Tax? a. Employment Development Department b. County Unemployment Office c. Franchise Tax Board d. Internal Revenue Service 3. Who does not need a California Contractor's State Li- cense? b. Overhead a. Employment Develop- ment Department d. Sale or installation of finished products that do not become a fixed part of a. Someone who repairs or maintains an air-condition- the structure ing unit or heat-pump unit. b. Someone who installs mobile-homes c. Someone who digs wells on the property of others d. Sale or installation of finished products that do not become a fixed part of the structure 4. Which of the following is not part of a Home-Improve- c. Twenty-Day Preliminary ment Contract? a. Mechanic's Lien Warning b. Notice of Cancellation c. Twenty-Day Preliminary Notice d. All of the above. Notice 5. Prime Contractor must pay subcontractor when? a. 10-days after Prime-contractor received payment b. When Prime-contractor receives withheld retention monies c. 30-days after completion d. As soon as subcontractor completes the work 6. The Contractor's Surety Bond is necessary for most contractors to obtain their license. This bond is in the amount of: a. $2,500 b. $7,000 c. $15,000 d. $25,000 7. How long with the CSLB hold a contractor responsible for observable defects? a. 5-years b. 4-years c. 3-years d. 2-years 8. In which of the following circumstances must a li- censed contractor provide their license number? a. On all contracts b. On all advertising c. On all "20-day Preliminary Notices" d. All of the above a. 10-days after Prime-contractor received payment c. $15,000 b. 4-years d. All of the above 9. How many classifications can a Responsible Managing d. As many as the RME can Employee apply for? a. One b. Two c. None d. As many as the RME can qualify for qualify for 10. If a contractor includes a provision in a contract for the d. The property owner and use of private arbitration and a dispute between the the prime contractor will owner and the contractor makes arbitration necessary, split the cost of the private who will bear the cost of the private arbitration? a. The California Contractor's License Board b. The property owner c. The prime contractor d. The property owner and the prime contractor will split the cost of the private arbitration 11. State Disability Insurance is paid by: a. Employees only b. Employers only c. Both employers and employees d. Neither employers nor employees 12. A contractor estimates labor and materials costs for a job to be $2,500.00. Allowing for 15% overhead and 18% profit, what should the total bid be? a. $3,222.00 b. $3,731.00 arbitration a. Employees only b. $3,731.00 c. $3,018.00 d. $3,825.00 Who is responsible for determining when the project is d. The ow

Vista previa del contenido

CSLB Practice Test With Complete Solutions.

1. The costs of running your business, including b. Overhead
office expenses, etc., is called:

a. Direct Costs
b. Overhead
c. A liability
d. Accrual

2. Which government agency collects State
a. Employment
Unemploy- ment Tax?
Develop- ment
a. Employment Development Department Department
b. County Unemployment Office
c. Franchise Tax Board
d. Internal Revenue Service

3. Who does not need a California Contractor's
State Li- cense?
d. Sale or installation of
finished products that
do not become a fixed
part of
a. Someone who repairs or maintains an air-condition- the structure
ing unit or heat-pump unit.
b. Someone who installs mobile-homes
c. Someone who digs wells on the property of others
d. Sale or installation of finished products that
do not become a fixed part of the structure

4. Which of the following is not part of a Home-Improve- c. Twenty-Day
Preliminary
ment Contract? b. Notice of
Cancellation
a. Mechanic's Lien Warning c. Twenty-Day
1/
17

, CSLB Practice Test With Complete Solutions.

Preliminary Notice Notice
d. All of the above.




2/
17

, CSLB Practice Test With Complete Solutions.


5. Prime Contractor must pay subcontractor d. All of the
when? above

a. 10-days after Prime-contractor received
payment
b. When Prime-contractor receives withheld
retention monies
c. 30-days after completion
d. As soon as subcontractor completes the work

6. The Contractor's Surety Bond is necessary
for most contractors to obtain their license.
This bond is in the amount of:

a. $2,500
b. $7,000
c. $15,000
d. $25,000

7. How long with the CSLB hold a contractor
responsible for observable defects?

a. 5-years
b. 4-years
c. 3-years
d. 2-years

8. In which of the following circumstances
must a li- censed contractor provide their
license number?

a. On all contracts
b. On all advertising
c. On all "20-day Preliminary Notices"
3/
17

Información del documento

Subido en
6 de julio de 2025
Número de páginas
17
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ROSEGRADES
3.4
(35)
Vendido
236
Seguidores
87
Artículos
12121
Última venta
3 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes