Pass the Certified Inspector of Sediment and Erosion Control (CISEC) Exam with confidence! This high-yield guide includes real exam-style questions and expert explanations, ensuring you master erosion control, site inspections, and regulatory compliance. Key Topics Covered: Erosion & Sediment Control (ESC) Plans – Design, implementation, and maintenance Regulatory Standards – NPDES, EPA, and state-specific requirements Best Management Practices (BMPs) – Silt fences, sediment basins, stabilization techniques Inspection Protocols – Common violations and corrective actions Detailed Answer Rationales – Understand why answers are correct Quick-Reference Charts – BMP selection criteria, inspection checklists Why Choose This Guide? Exam-Aligned – Matches latest CISEC test content Field-Tested – Written by certified inspectors Saves Time – Focuses on most-tested concepts

Vista previa del contenido

CISEC EXAM LATEST UPDATE CORRECT
ANSWERS GRADED A+

T/F: The CGP states that inspections are to occur only during normal
working hours - ANSWER--True


T/F: the CGP does not mandate inspection of equipment storage and
maintenance areas - ANSWER--False


T/F: Since 1998, regulations require permits for Phase I (5 acres or
more) projects. Since 2003, permits also required for Phase II (1 or
more acres) projects - ANSWER--True


T/F: Under the CWA, citizens can bring civil action against violators of
statutes and regulations. - ANSWER--True


As of 2019, Class I Administrative penalties under the CWA are up to
BLANK per violation with a max. penalty of BLANK - ANSWER--$20,628;
$51,570


Who has the responsibility to make sure that maintenance has been
performed on the best management practices? - ANSWER--Contractor
and Inspector

,Who has the responsibility to make sure that control measures are
properly selected, installed, and maintained? - ANSWER--Designer,
Inspector, and Contractor


T/F: The NPDES permit authorizes operators to discharge pollutants in
the manner that makes most sense for the site. - ANSWER--False


T/F: The EPA must grant approval for cationic flocculants. - ANSWER--
True


T/F: The goal of the NPDES permit is to eliminate all discharge of
pollutants from a construction site. - ANSWER--False: minimize


T/F: The EPA is adamant that BMPs only be installed during the early
phases of construction site development. - ANSWER--False


Inspections must be done within 24 hours of a storm event which has
or greater of rainfall. - ANSWER--0.25 inches


T/F: The SWPPP should always include the frequency of inspections -
ANSWER--True

,T/F: Inspections should occur even in conditions that are unsafe to
personnel. - ANSWER--False


After identifying issues, the SWPPP should be updated and updates
must occur within - ANSWER--7 calendar days


What method of erosion is marked by the bounding of soil particles? -
ANSWER--Saltation


Where does runoff flow? - ANSWER--From high point to low point


Offsite flows must be BLANK if they can't be BLANK - ANSWER--
Treated; diverted


What is hydrology? - ANSWER--The study of water


What are sources of water - ANSWER--Precipitation (rain, snow, hail,
sleet)


Rate of flow depends on what 6 variables? - ANSWER--Soil types and
roughness
Storm intensity and duration

, Contributing areas
Steepness of terrain
Length of slope
Vegetative cover


What is a hydrograph? - ANSWER--Picture of runoff
X-Axis: flow in cubic feet per second (cfs)
Y-Axis: time in minutes
Peak = maximum flow during runoff event


What is a sedigraph? - ANSWER--Represents sediment discharge
X-Axis: sediment yield rate
Y-Axis: time


When working in waterways or wetlands, which permit is required? -
ANSWER--404 Permit


NPDES - ANSWER--National Pollutant Discharge Elimination System
Section of CWA (Clean Water Act) to permit stormwater discharges
associated with industrial activities per the permit

Información del documento

Subido en
5 de julio de 2025
Número de páginas
32
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
OliviaRN
3.0
(22)
Vendido
101
Seguidores
62
Artículos
468
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes