• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 8 páginas
Examen

WFSM VOLUME 1 QUESTIONS AND ANSWERS (GRADED A+)

Document preview thumbnail
Vista previa 2 fuera de 8 páginas

WFSM VOLUME 1 QUESTIONS AND ANSWERS (GRADED A+)WFSM VOLUME 1 QUESTIONS AND ANSWERS (GRADED A+)WFSM VOLUME 1 QUESTIONS AND ANSWERS (GRADED A+) The manuals the Air Force develops or pays a contractor to develop for all equipment built to military specifications are called a. technical orders (TO) b. joint-use manuals. c. commercial-off-the-shelf (COTS) manuals. d. time compliance technical orders (TCTO) manuals. - ANSWER-a. technical orders (TO) Which manuals use a layout that follows the one used by the branch of service that initially had it developed.

Vista previa del contenido

WFSM VOLUME 1 QUESTIONS AND
ANSWERS (GRADED A+)
The manuals the Air Force develops or pays a contractor to develop for all equipment
built to military specifications are called
a. technical orders (TO)
b. joint-use manuals.
c. commercial-off-the-shelf (COTS) manuals. d. time compliance technical orders
(TCTO) manuals. - ANSWER-a. technical orders (TO)

Which manuals use a layout that follows the one used by the branch of service that
initially had it developed.
a. Technical orders (TO).
b. Joint-use manuals.
c. Technical manuals (TM).
d. Commercial-off-the-shelf (COTS) manuals. - ANSWER-b. Joint-use manuals.

Which manuals come with locally procured equipment items?
a. Technical orders (TO).
b. Joint use manuals.
c. Technical manuals (TM).
d. Commercial - off - the - shelf ( COTS ) manuals . - ANSWER-d. Commercial - off - the
- shelf ( COTS ) manuals .

Which manuals may include actions to modify equipment, perform special inspections,
or change operating procedures?
a. Time compliance technical orders (TCTO)
b. Abbreviated technical orders (TO).
c. Technical manuals TM).
d. Joint use manuals. - ANSWER-a. Time compliance technical orders (TCTO)

Which type of time compliance technical orders (TCTO) can be identified by a border of
red Xs around the page?
a. Inspection.
b. Urgent action.
c. Routine action.
d. Immediate action. - ANSWER-d. Immediate action.

Which type of time compliance technical orders (TCTO) can be identified by a border of
alternating red Xs and /s around the page? a. Inspection.
b. Urgent action
c. Routine action.
d. Immediate action. - ANSWER-b. Urgent action

, Why must you read identify any problems you find in a technical order (TO)?
a. It shows that you read the TO
b. It shows that you always use the TO.
c. To allow all Air Force (AF) personnel to complete the task differently.
d. To allow all AF personnel to complete the task the same way - ANSWER-d. To allow
all AF personnel to complete the task the same way

Which is the best method to make corrections to problems in a technical order (TO)?
a. A team effort of many Airmen.
b. Your effort researching the problem.
c. A team effort of many knowledgeable individuals
d. Your effort experimenting with possible corrections. - ANSWER-c. A team effort of
many knowledgeable individuals

What Air Force instruction (AFI) covers waste management?
a. AFI 36-2903.
b. AFI 32-7042.
c. AFI 38-5243.
d. AFI 33-2233. - ANSWER-b. AFI 32-7042.

Where can you find container labeling guidelines?
a. Installation hazardous waste management plan (HWMP).
b. In the power production section.
c. The environmental flight.
d. Installation library. - ANSWER-a. Installation hazardous waste management plan
(HWMP).

What are the three principal accident prevention methods?
a. Punishment, disciplinary action, and deterrence
b. Behavior modification, motivation, and strict adherence to the rules.
c. Accident investigation, safety standards, and use of large hazard markings.
d. Physical modification, education and training, and enforcement of safety standards. -
ANSWER-d. Physical modification, education and training, and enforcement of safety
standards.


When referring to electrical circuits, a closed circuit means.
a. electricity is traveling through the line
b. electricity has been shut off.
c. electricity poses no hazard.
d. the line is safe to work on. - ANSWER-a. electricity is traveling through the line.

What item should you use to remove someone from an energized circuit?
a. Metal pole.
b. Piece of dry wood.

Información del documento

Subido en
4 de julio de 2025
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NursingTutor1
3.9
(460)
Vendido
1706
Seguidores
1073
Artículos
18488
Última venta
4 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes