• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 18 páginas
Examen

WFSM PRE EOC BLOCK 1 QUESTIONS AND ANSWERS 100% CORRECT

Document preview thumbnail
Vista previa 3 fuera de 18 páginas

WFSM PRE EOC BLOCK 1 QUESTIONS AND ANSWERS 100% CORRECTWFSM PRE EOC BLOCK 1 QUESTIONS AND ANSWERS 100% CORRECTWFSM PRE EOC BLOCK 1 QUESTIONS AND ANSWERS 100% CORRECT 1. In which storage area would you find routinely used, high-use materials, such as polyvinyl chloride (pvc) pipe, glue, cleaner, and nails? a. residue holding area. b. holding area. c. shop stock. d. bench stock. - ANSWER-d. bench stock 2. What happens when an individual planning a job orders the incorrect material by mistake?

Vista previa del contenido

WFSM PRE EOC BLOCK 1 QUESTIONS
AND ANSWERS 100% CORRECT
1. In which storage area would you find routinely used, high-use materials, such as
polyvinyl chloride (pvc) pipe, glue, cleaner, and nails?
a. residue holding area.
b. holding area.
c. shop stock.
d. bench stock. - ANSWER-d. bench stock

2. What happens when an individual planning a job orders the incorrect material by
mistake?
a. civil engineering (ce) must accept the material, even if it cannot be used for that job.
b. incorrect materials that are actually delivered are returned at the senders expense.
c. the individual who ordered the incorrect materials is entered into training.
d. the individual who planned the job pays for the incorrect material. - ANSWER-a. civil
engineering (ce) must accept the material, even if it cannot be used for that job.

3. What type of work is not part of preventive maintenance (pm)?
a. utilities operations.
b. utilities maintenance.
c. facility maintenance.
d. equipment maintenance. - ANSWER-a. utilities operations.

4. Which plan shows a top view of the building as if the top was cut off (cross-
sectional)?
a. mechanical
b. foundation
c. elevation plan.
d. floor plan - ANSWER-d. floor plan.

5. What do you do to a base utility map any time you make a change in a utility system?
a. discard the old prints
b. never modify original prints
c. have all original prints cleared through engineering.
d. note changes on prints and notify engineering. - ANSWER-d. note changes on prints
and notify engineering.

6. What three views are used in working sketches?
a. isometric, back and side
b. top, side, and isometric
c. front, back and side.
d. back, top and front - ANSWER-b. top, side and isometric

,7. What written documents explain points that are not readily explained by drawings?
a. base utilities maps
b. working sketches
c. Bill of materials (bom)
d. specifications - ANSWER-d. specifications

8. What formula is used to calculate chemical feed rate in pounds per day?
a. perimeter.
b. volume.
c. dosing.
d. area. - ANSWER-c. dosing

9. What is defined as the vertical distance from the surface of water to the point of use?
a. head
b. weight
c. volume
d. velocity - ANSWER-a. head

10. What is the weight of one gallon (gal.) of water?
a. 6.34 lb
b. 7.34 lb
c. 8.34 lb
d. 9.34 lb - ANSWER-c. 8.34 lb

11. How many feet of head does 1 pound per square inch (psi) of water produce?
a. 1.31
b. 2.31
c. 3.31
d. 4.31 - ANSWER-b. 2.31

12. Which metric prefix equals 1,000?
a. milli
b. centi
c. deci
d. kilo - ANSWER-d. kilo

13. Metric wrenches are sized in
a. kilometers
b. decimeters
c. centimeters
d. millimeters - ANSWER-d. millimeters

14. What is the study of living things?
a. biology
b. geometry

, c. chemistry
d. anatomy - ANSWER-a. biology

15. Which disease is commonly transmitted through drinking water?
a. typhoid
b. measles
c. mumps
d. cancer - ANSWER-a. typhoid

25. Non-lubricated plug valves generally fall into four main types including lift, movable-
seat, resilient-liner, and
a. check
b. globe
c. butterfly
d. double-block bleed (DBB) - ANSWER-d. double block and bleed (DBB)

26. Which item prevents leakage past the hub of the resilient-liner plug valve?
a. o-ring
b. diaphragm seal
c. asbestos gasket
d. graphite packing - ANSWER-b. diaphragm seal

27. What type valve does not have to be removed during hydrostatic testing?
a. double block and bleed (DBB) plug valve.
b. resilient liner plug valve.
c. gate valve.
d. ball valve. - ANSWER-a. double block and bleed (DBB) plug valve.

28. What inspection and maintenance items are performed on a double block bleed
(DBB) plug valve during a routine scheduled interval?
a. check for leaks and proper operation.
b. operator lubrication, bleed test, and corrosion control.
c. proper operation, operator lubrication, checking for leaks and corrosion control.
d. proper operation, checking for leaks, corrosion control, and replacement of the
sealing slips. - ANSWER-c. proper operation, operator lubrication, checking for leaks,
and corrosion control.

30. What is the first step in removing a General Twin Seal plug valve operator?
a. drain the line.
b. close the main valve.
c. open the main valve.
d. worm gear. - ANSWER-b. close the main valve

31. What type valve used in fuels systems must operate from fully open with a 90-
degree rotaion?
a. gate

Información del documento

Subido en
4 de julio de 2025
Número de páginas
18
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$19.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NursingTutor1
3.9
(460)
Vendido
1706
Seguidores
1073
Artículos
18488
Última venta
4 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes