WFSM - SET B (VOLUME 2) QUESTIONS AND ANSWERS 100% CORRECT

Document preview thumbnail
Vista previa 2 fuera de 15 páginas

WFSM - SET B (VOLUWFSM - SET B (VOLUME 2) QUESTIONS AND ANSWERS 100% CORRECTWFSM - SET B (VOLUME 2) QUESTIONS AND ANSWERS 100% CORRECTWFSM - SET B (VOLUME 2) QUESTIONS AND ANSWERS 100% CORRECTME 2) QUESTIONS AND ANSWERS 100% CORRECT what is the normal criterion used to figure the fuel requirement of a base that is not used as a primary port? A.)10 days supply based on wartime commitment only B.) 15 day supply of based on peacetime commitment only C.) 10 day supply based on both war and peacetime D.) 15 day supply based on both war and peacetime - ANSWER-C.) 10 day supply based on both war and peacetime the defense logistics agency determines the type size and number of fuel tanks needed at each base based upon A.)air force squadron designed B.) the mission requirements C.) available construction dollars D.) major command recommendations - ANSWER-B.) the mission requirements what will horizontal underground storage tanks and cut and cover tanks that issue jet fuel have on top of them

Vista previa del contenido

WFSM - SET B (VOLUME 2) QUESTIONS
AND ANSWERS 100% CORRECT
what is the normal criterion used to figure the fuel requirement of a base that is not used
as a primary port?
A.)10 days supply based on wartime commitment only
B.) 15 day supply of based on peacetime commitment only
C.) 10 day supply based on both war and peacetime
D.) 15 day supply based on both war and peacetime - ANSWER-C.) 10 day supply
based on both war and peacetime

the defense logistics agency determines the type size and number of fuel tanks needed
at each base based upon
A.)air force squadron designed
B.) the mission requirements
C.) available construction dollars
D.) major command recommendations - ANSWER-B.) the mission requirements

what will horizontal underground storage tanks and cut and cover tanks that issue jet
fuel have on top of them
A.) a pump house
B.) a concrete cover
C.) an open air shed
D.) nothing to prevent collapse of the tank - ANSWER-A.) a pump house

what components should you replace before you replace a manway cover?
A.) new nuts and bolts
B.) the old gasket if it is in good condition
C.) a new gasket slightly thicker than the old one
D.)a new gasket the same thickness as the old one - ANSWER-D.)a new gasket the
same thickness as the old one

what size pipe is used as the gauge well on a cone roof tank with a floating pan?
A.) 2"
B.)4"
C.) 6"
D.) 8" - ANSWER-D.) 8"

the product withdrawal line terminates inside a cone roof tank with a floating pan in a
A.) vertical position 6" above the top of the sump
B.) vertical position 6 inches above the bottom of the sump
C.)horizontal position 6 inches above the top of the sump

, D.) horizontal position 6 inches above the bottom of the sump - ANSWER-A.) verticle
postion 6nches above the top of the sump

what size is the water draw off line in an all weather tank and where does it terminate?
A.)1\2 inch- 1\2 inch from the bottom of the sump
B.) 1\2 inch- inch form the sump bottom
C.)3\4 inch- 1\2 inch form the sump bottom
D.)3\4 inch- 1 inch from the sump bottom - ANSWER-C.) 3\4 inch- 1\2 inch from the
sump bottom

what is the slope of the topping line inside an all weather tank and where does it
terminate?
A.) 4 inch per 10 ft 4 inch above the sump
B.) 4 inches per 10 ft 4 inches form the sump bottom
C.) 6 inches per 10 ft 4 inches above the sump
D.)6 inches per 10 feet 4 inches form the sump bottom - ANSWER-D.) 6 inches per 10
ft 4 inches from the sump bottom

at what level does the high level alarm actuate on a cone roof with a floating pan?
A.) just before the high level shutoff level
B.) just after the high level shutoff level
C.) just before the high level alarm
D.) just after the high level alarm - ANSWER-A.) just before the high level shut off level


what is the inspection frequency for a pressure relief valve?
A.)monthly
B.)quarterly
C.)semiannually
D.)annually - ANSWER-D.) Annually

what prevents fuel from entering a roof drain line?
A.)flange gaskets and Teflon ring packing
B.)flange gaskets and asbestos ring packing
C.)threaded gaskets and Teflon ring packing
D.)threaded gaskets and asbestos ring packing - ANSWER-B.) Flange gasket with
asbestos ring packing

when you are inspecting the fabric seal on floating roof tanks a gap between the
metallic sealing ring and tank shell would indicate a warped sealing ring of
A.)5-10 feet long
B.)10-15 ft long
C.)5-10 inches wide
D.)10-15 inches wide - ANSWER-B.) 10-15 feet long

when filling the tank to check the high high level alarm what must be disabled

Información del documento

Subido en
4 de julio de 2025
Número de páginas
15
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$19.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NursingTutor1
3.9
(460)
Vendido
1706
Seguidores
1073
Artículos
18488
Última venta
4 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes