• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 87 páginas
Examen

CPSM DIAGNOSTIC PRACTICE EXAM 1 2025 QUESTIONS AND ANSWERS

Document preview thumbnail
Vista previa 4 fuera de 87 páginas

A supply manager issues a request to proposal for engineering services. In order to provide clarification on the specification on the specifications, the company holds a question-and- answer session for interested suppliers. Shortly after the question-and-answer session is held and before any proposals are actually received, the firm's engineering department revises the specifications. Given this situation, which of the following should the supply manager do FIRST? (A) Call and email the suppliers of the change, tell them when the new specifications will be available, and ask for immediate notification if additional time will be required. (B) Write a letter to each supplier advising of the change, tell each supplier when the new specifications will be available, and ask for immediate notification if additional time will be required. (C) Hold an interim pre-bid meeting withal suppliers to discuss and clarify the revi - ANS (A) Call and email the suppliers of the change, tell them when the new specifications will be available, and ask for immediate notification if additional time will be required. CPSM DIAGNOSTIC PRACTICE EXAM 1 2025 QUESTIONS AND ANSWERS Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 2 Which of the following should have the MOST influence in determining end product specifications, so as to minimize the potential for returns? (A) Marketing (B) Supply management (C) Engineering (D) Manufacturing - ANS (A) Marketing When developing specifications, a buyer may consider information from which of the following? I. Suppliers II. Industry Standards III. Professional Organizations IV. Competitors (A) I and IV only (B) II and III only Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 3 (C) I, II and III only (D) I, II, III and IV - ANS (D) I, II, III and IV A supply manager completes a category profile and identifies services provided through multiple suppliers. A market and industry analysis shows that the service provides are growing their businesses by acquiring competitors, thus enabling them to provide a greater range of services. Which of the following techniques will BEST enable the supply manager to leverage market competition? (A) Lotting strategy (B) Market-basket model (C) Market segmentation (D) Sole sourcing - ANS (A) Lotting strategy A supply manager implements a system whereby the potential supplier names are hidden until final contract awards are made. This example is BEST described as ensuring (A) confidential information is protected Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 4 (B) diversity initiatives are met (C) total costs are minimized (D) collusion will not occur - ANS (A) confidential information is protected A supply manager for a privately held manufacturing company is preparing an RFP for raw materials. None of the RFP recipients is an incumbent, and the award resulting from the RFP is expected to be of significant dollar value. The supply manager is concerned that the lack of publicly available financial information could impact willingness of the prospective suppliers to submit proposals. Which of the following will BEST address the concerns of the prospective bidders? (A) Escrow account (B) Letter of credit (C) Payment bond (D) Surety bond - ANS (B) Letter of credit Which of the following is th

Vista previa del contenido

CPSM DIAGNOSTIC PRACTICE EXAM 1
2025 QUESTIONS AND ANSWERS




A supply manager issues a request to proposal for engineering services. In order to provide

clarification on the specification on the specifications, the company holds a question-and-

answer session for interested suppliers. Shortly after the question-and-answer session is held

and before any proposals are actually received, the firm's engineering department revises the

specifications. Given this situation, which of the following should the supply manager do FIRST?




(A) Call and email the suppliers of the change, tell them when the new specifications will be

available, and ask for immediate notification if additional time will be required.


(B) Write a letter to each supplier advising of the change, tell each supplier when the new

specifications will be available, and ask for immediate notification if additional time will be

required.


(C) Hold an interim pre-bid meeting withal suppliers to discuss and clarify the revi - ANS (A)

Call and email the suppliers of the change, tell them when the new specifications will be

available, and ask for immediate notification if additional time will be required.


Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 1

,Which of the following should have the MOST influence in determining end product

specifications, so as to minimize the potential for returns?




(A) Marketing


(B) Supply management


(C) Engineering


(D) Manufacturing - ANS (A) Marketing




When developing specifications, a buyer may consider information from which of the

following?




I. Suppliers


II. Industry Standards


III. Professional Organizations


IV. Competitors


(A) I and IV only


(B) II and III only

Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 2

,(C) I, II and III only


(D) I, II, III and IV - ANS (D) I, II, III and IV




A supply manager completes a category profile and identifies services provided through

multiple suppliers. A market and industry analysis shows that the service provides are growing

their businesses by acquiring competitors, thus enabling them to provide a greater range of

services. Which of the following techniques will BEST enable the supply manager to leverage

market competition?




(A) Lotting strategy


(B) Market-basket model


(C) Market segmentation


(D) Sole sourcing - ANS (A) Lotting strategy




A supply manager implements a system whereby the potential supplier names are hidden until

final contract awards are made. This example is BEST described as ensuring




(A) confidential information is protected



Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 3

, (B) diversity initiatives are met


(C) total costs are minimized


(D) collusion will not occur - ANS (A) confidential information is protected




A supply manager for a privately held manufacturing company is preparing an RFP for raw

materials. None of


the RFP recipients is an incumbent, and the award resulting from the RFP is expected to be of

significant dollar value. The supply manager is concerned that the lack of publicly available

financial information could impact willingness of the prospective suppliers to submit proposals.

Which of the following will BEST address the concerns of the prospective bidders?




(A) Escrow account


(B) Letter of credit


(C) Payment bond


(D) Surety bond - ANS (B) Letter of credit




Which of the following is the LEAST critical element in a best alternative to a negotiated

agreement (BATNA)?



Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 4

Información del documento

Subido en
2 de julio de 2025
Número de páginas
87
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Brightstars
3.3
(41)
Vendido
269
Seguidores
8
Artículos
15151
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes