• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 7 páginas
Examen

Rwp Pg Study Guide Exam Test.

Document preview thumbnail
Vista previa 2 fuera de 7 páginas

RWP PG STUDY GUIDE EXAM TEST. type of working limits on controlled track - CORRECT ANSWER foul time, exclusive track occupancy type of working limits on non-controlled track - CORRECT ANSWER inaccessible track type of train approach warning - CORRECT ANSWER watchman type of train approach warning - CORRECT ANSWER individual train detection What type of work roadway workers do? - CORRECT ANSWER inspection and construction of track, maintenance of bridges, repair of signal and communication systems, repair of RMM True or false. Fouling a track can apply to both people and machinery - CORRECT ANSWER True Within what distance to the track is a roadway worker considered fouling it? - CORRECT ANSWER 4 feet from the nearest running rail a what authorizes movements on controlled track. - CORRECT ANSWER Operator/Dispatcher The RWIC is required to be qualified on physical characteristics when their group is working on.... - CORRECT ANSWER All tracks The EIC is an employee who is in charge of.... - CORRECT ANSWER A work group The main role of the RWIC is.... - CORRECT ANSWER To establish on track safety When can personal electronic devices be used while on duty? - CORRECT ANSWER If there is an emergency at the job site and no other forms of communication are available

Vista previa del contenido

RWP PG STUDY GUIDE EXAM TEST.

type of working limits on controlled track - CORRECT ANSWER foul time, exclusive track occupancy



type of working limits on non-controlled track - CORRECT ANSWER inaccessible track



type of train approach warning - CORRECT ANSWER watchman



type of train approach warning - CORRECT ANSWER individual train detection



What type of work roadway workers do? - CORRECT ANSWER inspection and construction of track,
maintenance of bridges, repair of signal and communication systems, repair of RMM



True or false. Fouling a track can apply to both people and machinery - CORRECT ANSWER True



Within what distance to the track is a roadway worker considered fouling it? - CORRECT ANSWER 4 feet
from the nearest running rail



a what authorizes movements on controlled track. - CORRECT ANSWER Operator/Dispatcher



The RWIC is required to be qualified on physical characteristics when their group is working on.... -
CORRECT ANSWER All tracks



The EIC is an employee who is in charge of.... - CORRECT ANSWER A work group



The main role of the RWIC is.... - CORRECT ANSWER To establish on track safety



When can personal electronic devices be used while on duty? - CORRECT ANSWER If there is an
emergency at the job site and no other forms of communication are available

, Prior to performing any task that requires fouling a track or has the potential to foul a track, all roadway
workers must participate in an.... - CORRECT ANSWER on-track safety briefing



The safety briefing must be conducted.... - CORRECT ANSWER At the job location



Whistle boards are required when.... - CORRECT ANSWER 5 or more employees are working for more
than 1 hour



When using foul time with off-track equipment for more than 5 minutes on a main track you must use....
- CORRECT ANSWER a supplemental shunting device



Local control is used for.... - CORRECT ANSWER C&S inspections/testing or joint C&S and MW switch
inspection



How is a job briefing documented? - CORRECT ANSWER NRPC 4104



When is an on-track safety briefing required? - CORRECT ANSWER When performing any task that has
potential to foul a track.



Who is responsible for establishing on-track safety? - CORRECT ANSWER RWIC



What does foul time ensure for the crew working in the designated area(working limits)? - CORRECT
ANSWER That no trains will operate within the working limits



What information is provide by the RWIC when requesting foul time? - CORRECT ANSWER Name and
title, time limits, track designation, track limits



When is the use of an SSD required? - CORRECT ANSWER Any situation in which equipment is used for
foul time longer than 5 minutes

Información del documento

Subido en
27 de junio de 2025
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ROSEGRADES
3.4
(35)
Vendido
236
Seguidores
87
Artículos
12121
Última venta
3 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes