Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 10 páginas
Examen

AFSB 152 EXAM NEWEST ACTUAL EXAM WITH COMPLETE QUESTIONS AND CORRECT VERIFIED ANSWERS (DETAILED ANSWERS) ALREADY GRADED A+ 100% GUARANTEED TO PASS CONCEPTS!!!

Document preview thumbnail
Vista previa 2 fuera de 10 páginas

AFSB 152 EXAM NEWEST ACTUAL EXAM WITH COMPLETE QUESTIONS AND CORRECT VERIFIED ANSWERS (DETAILED ANSWERS) ALREADY GRADED A+ 100% GUARANTEED TO PASS CONCEPTS!!!

Vista previa del contenido

AFSB 152 Exam With 100% Correct
Answers 2023
Surety bond - Correct Answer-A written contract that expresses one party's promise to
answer for another party's failure to do something as promised.

Surety - Correct Answer-The party (usually an insurer) to a surety bond that guarantees
to the oblige that the principal will fulfill an obligation or perform as required by the
underlying contract, permit, or law.

Obligee - Correct Answer-The party to a surety bond that receives the surety's
guarantee that the principal will fulfill an obligation or perform as promised.

Principal - Correct Answer-The party to a surety bond whose obligation or performance
the surety guarantees.

Suretyship - Correct Answer-The obligation of one entity to answer for the debt, default,
or miscarriage of performance of duties by another entity.

Contract bond - Correct Answer-A surety bond guaranteeing the fulfillment of
obligations under construction contracts or other types of contracts.

Bid bond - Correct Answer-A contract bond guaranteeing that a contractor bidding on a
construction or supply contract will enter into the contract and will provide a
performance bond if the bid is accepted.

Design/build - Correct Answer-A construction method that offers "one-stop shopping" to
design and construction services.

Construction mortgage - Correct Answer-A loan that provides financing during the
construction period.

The owner usually pays interest on the funds borrowed but makes no principal payment.

Permanent mortgage - Correct Answer-A loan that provides financing after construction
is complete.

Payments to the lender include both interest and principal, and the mortgage is
expected to be in effect for a number of years.

Subcontractor (specialty contractor) - Correct Answer-An independent contractor who
specializes in a particular kind of work and who is engaged by a general contractor to
perform a particular portion of the general contractor's contract.

, Mobilization - Correct Answer-The process before the construction begins that involves
initial activities to facilitate a construction process, such as moving equipment and a
field office onto the job site and installing temporary utilities.

Critical path method (CPM) - Correct Answer-A process that identifies every major
element of the construction project, as well as a time estimate for each element, and
assembles these elements into one master schedule.

Punch list - Correct Answer-A list of small finishing tasks that must be accomplished for
completion.

General building contractor - Correct Answer-An independent contractor who obtains
the primary contract for a project and either completes all the work or subcontracts
portions (or all) of the work to other independent contractors who specialize in such
work.

General engineering Contractor - Correct Answer-A contractor that constructs locks and
dams, power plants, large bridges, sewage and water treatment plants, or similar
projects for public and private owners.

Heavy and highway construction - Correct Answer-A type of construction used for
highways, bridges, dams, roads, railroad beds, and similar projects.

Material Supplier - Correct Answer-Manufacturer or distributor that sells materials and
equipment.

Change order - Correct Answer-The written consent form the architect and owner that
modifies the construction contract in price and substance.

Retainage - Correct Answer-The amount that an owner withholds from contract
payments until the project is substantially complete. Alternatively referred to as
retainings or retention.

What do Design/build contractors offer in terms of benefits......? - Correct Answer--
Reduced costs because the owner does not pay a design fee in addition to the
construction overhead and profit
-Reduced planning time because delays in communication among design professionals,
contractors, and the owner are eliminated
-Reduced costs because of the contractor's experience with and knowledge of the costs
associated with various construction techniques and materials

what are the two types of financing programs typically used for construction...? - Correct
Answer-The construction mortgage and the permanent mortgage

Libro relacionado
 image
Editorial: 2006 ISBN: 9781590316498 Edición: Desconocido

Información del documento

Subido en
24 de junio de 2025
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$21.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
3
Seguidores
0
Artículos
738
Última venta
7 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes