Masonry wall is a required be breeze that what Heights? - Correct Ans-8 feet What is the minimum clearance between the side rails of a portable ladder - Correct Ans-11.5 ft What does the OSHA recordkeeping incident rate and calculation include - Correct Ans Number of employees times 200,000 divided by total hours worked Accident prevention programs require CP inspections how often - Correct Ans-Frequent What is the definition of a qualified person - Correct Ans-Ability to demonstrate knowledge and has a recognized agree When are danger signs required - Correct Ans-To identify immediate hazards I'll hand and power tools must be maintained and what condition - Correct Ans-Good operating conditions and free from recognize hazards and guarded What must be provided to protect employees from welding hazards - Correct Ans Shielding What is the maximum allowed for distance for a personal fall arrest system to ensure the worker does not hit the ground and or strike a lower level object - Correct Ans-6 feet What is the minimum clearance between overhead sprinklers deflectors and material store beneath them - Correct Ans-36 inches When do horizontal standards apply - Correct Ans-When a condition is not covered by a specific standard Who is exempt from OSHA's recordkeeping rule requiring employers to keep OSHA 300 logs - Correct Ans-10 or less employees order on the exemption list or sole proprietor Who is responsible to ensure that all electrical equipment used by employees are free from recognized hazards - Correct Ans-The employer What must an employer do if they identify a circular saw with a damaged cord and or missing blade guard - Correct Ans-Tag and removed from service OSHA 510 OSHA 510 What must an employer do to protect employees who are using quad sets and receptacles which are not part of the permanent wiring of a building or structure - Correct Ans-Free from recognize hazards, checks, GFCI, assured conducting program All supported scaffold shall be restrained by gying, tying or bracing at what height - Correct Ans-4 to 1 ratio Demolition operations require an enclosed shoot for material disposal when - Correct Ans-Above or equal to 45° angle When shall an employer provide a respirator to an employee - Correct Ans-When such equipment is necessary When was an employer ensure a person with a valid first aid training certificate is available on the website - Correct Ans-When infirmary is not within five minutes and reasonably accessible Who is responsible for approval of attachments or modification to a power industrial truck - Correct Ans-The manufacture Who is responsible to make sure all PPE is issued to employees is adequate, cemetery, and properly maintained - Correct Ans-Employer What are the four main parts of an OSHA inspection - Correct Ans-Credentials, opening, walk around, and closing What actions were decorating employer fail to take which would likely result in a citation under the multiemployer citation policy - Correct Ans-Failed to inform hazards What health hazard are you likely to encounter when engaged in Bridge repair, residential renovation, demolition, and salvaging work - Correct Ans-Lead, asbestos, and silica What soil classification type would you specify for a sandy clay loan with an unconfined compressive strength of 1.2 tons per square foot - Correct Ans-Type B What Sheldon player do when they discover a portable ladder with any structural defects, damage, missing runs - Correct Ans-Tag and remove Damaged trench she'll she'll be removed from service by a competent person and evaluated and approved for continuous use by whom - Correct Ans-Professional engineer Sub part H requires already equipment to be inspected when - Correct Ans-Prior to each shift and as necessary before each use OSHA 510 Who has authority to start a crane load left until a qualified person has determined that the load is safe to lift - Correct Ans-The operator Electrical equipment requires grounding against accidental contact over how many volts - Correct Ans-50 V Removal of equipment roll over protective structure she'll only be remounted when - Correct Ans-When equal or better bolts are required for her original mounting What is the hierarchy of controls for controlling chemical exposure - Correct Ans Elimination, substitution, engineering, administrative, personal protective equipment What are some of results of workplace injuries and illnesses - Correct Ans-Last time, days away, lower morale, increased cost What protection does a worker have under OSHA at section 11 C - Correct Ans-Seek safety and health without fear of retaliation OSHA act section 1 contains white key statement -

Vista previa del contenido

OSHA 510



Osha 510 Test Questions And Answers
2025

Masonry wall is a required be breeze that what Heights? - Correct Ans-8 feet

What is the minimum clearance between the side rails of a portable ladder - Correct
Ans-11.5 ft

What does the OSHA recordkeeping incident rate and calculation include - Correct Ans-
Number of employees times 200,000 divided by total hours worked

Accident prevention programs require CP inspections how often - Correct Ans-Frequent

What is the definition of a qualified person - Correct Ans-Ability to demonstrate
knowledge and has a recognized agree

When are danger signs required - Correct Ans-To identify immediate hazards

I'll hand and power tools must be maintained and what condition - Correct Ans-Good
operating conditions and free from recognize hazards and guarded

What must be provided to protect employees from welding hazards - Correct Ans-
Shielding

What is the maximum allowed for distance for a personal fall arrest system to ensure
the worker does not hit the ground and or strike a lower level object - Correct Ans-6 feet

What is the minimum clearance between overhead sprinklers deflectors and material
store beneath them - Correct Ans-36 inches

When do horizontal standards apply - Correct Ans-When a condition is not covered by a
specific standard

Who is exempt from OSHA's recordkeeping rule requiring employers to keep OSHA 300
logs - Correct Ans-10 or less employees order on the exemption list or sole proprietor

Who is responsible to ensure that all electrical equipment used by employees are free
from recognized hazards - Correct Ans-The employer

What must an employer do if they identify a circular saw with a damaged cord and or
missing blade guard - Correct Ans-Tag and removed from service


OSHA 510

Información del documento

Subido en
24 de junio de 2025
Número de páginas
3
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
AlexScorer
2.5
(2)
Vendido
11
Seguidores
0
Artículos
1800
Última venta
2 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes