Examen

Erosion and Sediment Control Certification Exam Solved Correctly To Score A+

Document preview thumbnail
Vista previa 2 fuera de 15 páginas

Erosion and Sediment Control Certification Exam Solved Correctly To Score A+

Vista previa del contenido

Erosion and Sediment Control
Certification Exam Solved Correctly To
Score A+
The following type of material is used in the installation of silt fence and super silt fence:
a. woven slit film
b. woven monofilament
c. nonwoven
d. none of the above CORRECT ANSWERS a. woven slit film

Per the ASTM D-4355 test method, all geotextiles used in MD for erosion and sediment
control must have an ultraviolet retention strength rating of at least:
a. 70%
b. 95%
c. 60%
d. 50% CORRECT ANSWERS a. 70%

In determining a stone classification size, the stone must be a well graded mixture
where 50% of the pieces by weight are below the weight of the midsize indicated as
d50.
a. true
b. false CORRECT ANSWERS a. true

A local jurisdiction may have stricter requirements than the State for material
specifications.
a. true
b. false CORRECT ANSWERS a. true

The minimum gauge wire for use in gabion baskets is:
a. 7
b. 12
c. 15
d. 11 CORRECT ANSWERS d. 11

The best way to prevent erosion is:
a. double up the silt fence
b. install a good working sediment trap
c. minimize the disturbed area and quickly re-establish vegetative cover
d. schedule construction when rain is not forecasted CORRECT ANSWERS c. minimize
the disturbed area and quickly re-establish vegetative cover

Following initial soil disturbance or re-disturbance, permanent or temporary stabilization
must be completed within __________ calendar days for all perimeter dikes, swales,

, ditches, perimeter slopes, and all slopes steeper than 3:1; and __________ calendar
days for all other disturbed or graded areas on the project site not under active grading.
a. 1, 2
b. 3, 7
c. 7, 14
d. 14, 21 CORRECT ANSWERS b. 3, 7

Adequate vegetative cover requires __________ percent ground cover.
a. 50
b. 80
c. 95
d. 100 CORRECT ANSWERS c. 95

An earth dike must be stabilized within 3 days of installation.
a. true
b. false CORRECT ANSWERS a. true

A stabilized construction entrance:
a. is made up of Class I riprap or equivalent recycled concrete
b. uses nonwoven geotextile underneath the stone/recycled concrete
c. should slope toward the exterior of the site so runoff from SCE flows offsite
d. none of the above CORRECT ANSWERS b. uses nonwoven geotextile underneath
the stone/recycled concrete

Other than for a single-family home the minimum length of a stabilized construction
entrance is:
a. 25 feet
b. 30 feet
c. 50 feet
d. 60 feet CORRECT ANSWERS c. 50 feet

The discharge from a SCE washrack should not be directed toward silt fence.
a. true
b. false CORRECT ANSWERS a. true

Benching is required on a slope steeper than 2:1 if its height is greater than:
a. 20 feet
b. 30 feet
c. 45 feet
d. 50 feet CORRECT ANSWERS a. 20 feet

The primary purpose of benching or serrated slopes is to:
a. provide additional area for landscaping
b. break up the surface flow of runoff on long steep slopes
c. provide a level area for wildlife crossing

Información del documento

Subido en
23 de junio de 2025
Número de páginas
15
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$17.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ElevatedExcellence
3.8
(178)
Vendido
951
Seguidores
505
Artículos
18297
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes