sh
OPS 571 Final 30/30 100%
ne
la
1 Define synchronous manufacturing as stated by Goldratt’s theory.
tz
sh
It is a production process organized to achieve the goals of the firm.
Sp
ne2 In a , the product remains in a specific location and the equipment, labor, and material
la
required for the product are gathered to the specific location.
project layout
sh
Sp
ne
3 A manufacturing firm efficiently assembles an airplane by bringing all the necessary raw materials,
parts, and equipment to a central location. This scenario illustrates a .
la
tz
project layout
sh
Sp
4 According to Goldratt’s definition, is the rate at which cash is generated by production
ne
through sales.
la
Throughput
sh
5 Identify a disadvantage of pure projects
Sp
ne
Equipment and people are not shared across projects.
la
6 are used for decisions that are related to aggregate and strategy demand.
tz
sh
Sp
Strategic forecasts
ne
7 is the characteristics of a product in terms of quality that are sorted as either conforming
la
or nonconforming to specification.
sh
An attribute
Sp
ne
8 Identify an advantage of pure projects
la
Team pride, motivation, and commitment are high.
tz
9 Identify a true statement about water transportation mode. sh
Sp
ne
It can handle a high capacity of materials.
la
10 involves testing random samples of the end product from a process to determine if the
process is churning out items within the predetermined range.
sh
Sp
Statistical process control
ne
11 is the design, operation, and improvement of the processes that create and deliver a
a
company’s essential products and services.
tz
l
sh
Sp
Operations and supply chain management
ne
12 Define waste reduction.
la
sh
Sp
This study source was downloaded by 100000830214522 from CourseHero.com on 01-13-2022 14:05:24 GMT -06:00
la
https://www.coursehero.com/file/26900667/OPS-571-Final-100-Correctdocx/
Sp