a flooring contractor cannot install what type of tile - 🧠 ANSWER
✔✔ceramic tile
the most common test for squareness of a room is - 🧠 ANSWER ✔✔3-4-5
triangle
in job preparation the room temperature should be-------- 2 days before and
2-3 days after - 🧠 ANSWER ✔✔minimum 65 degrees and maximum 95
degrees
when concrete floor is 18" above ground its called - 🧠 ANSWER ✔✔above
grade or suspended
if floor is lower than surrounding ground it is called - 🧠 ANSWER ✔✔below
grade
concrete floor slab that is poured on the ground is called - 🧠 ANSWER
✔✔on grade
1
COPYRIGHT©SARAHROSAPERAL 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED.
, a new concrete slab should be allowed to cure for at least----- before
installing - 🧠 ANSWER ✔✔60-120 days
3 methods to measure moisture - 🧠 ANSWER ✔✔the crystal method, the
glass method, the mats method
too much alkalinity on a concrete surface can prevent adhesives from
bonding ph level must be at - 🧠 ANSWER ✔✔8.0or below
concrete plank subfloors must be finished with - 🧠 ANSWER ✔✔2-3 inches
of concrete topping
with concrete plank subfloors what is not recomended - 🧠 ANSWER
✔✔mastic underlayments
priming is not a - 🧠 ANSWER ✔✔waterproof process
the purpose of priming is - 🧠 ANSWER ✔✔better adhesive bond
when a concrete floor is painted you must - 🧠 ANSWER ✔✔always remove
paint before installing
if installing carpet in top of resilient floor you must - 🧠 ANSWER ✔✔remove
all grease, wax, glue
2
COPYRIGHT©SARAHROSAPERAL 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED.
Questions with 100% Correct Answers |
Latest Update
a flooring contractor cannot install what type of tile - 🧠 ANSWER
✔✔ceramic tile
the most common test for squareness of a room is - 🧠 ANSWER ✔✔3-4-5
triangle
in job preparation the room temperature should be-------- 2 days before and
2-3 days after - 🧠 ANSWER ✔✔minimum 65 degrees and maximum 95
degrees
when concrete floor is 18" above ground its called - 🧠 ANSWER ✔✔above
grade or suspended
if floor is lower than surrounding ground it is called - 🧠 ANSWER ✔✔below
grade
concrete floor slab that is poured on the ground is called - 🧠 ANSWER
✔✔on grade
1
COPYRIGHT©SARAHROSAPERAL 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED.
, a new concrete slab should be allowed to cure for at least----- before
installing - 🧠 ANSWER ✔✔60-120 days
3 methods to measure moisture - 🧠 ANSWER ✔✔the crystal method, the
glass method, the mats method
too much alkalinity on a concrete surface can prevent adhesives from
bonding ph level must be at - 🧠 ANSWER ✔✔8.0or below
concrete plank subfloors must be finished with - 🧠 ANSWER ✔✔2-3 inches
of concrete topping
with concrete plank subfloors what is not recomended - 🧠 ANSWER
✔✔mastic underlayments
priming is not a - 🧠 ANSWER ✔✔waterproof process
the purpose of priming is - 🧠 ANSWER ✔✔better adhesive bond
when a concrete floor is painted you must - 🧠 ANSWER ✔✔always remove
paint before installing
if installing carpet in top of resilient floor you must - 🧠 ANSWER ✔✔remove
all grease, wax, glue