Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 24 páginas
Examen

ERC Certification End-Term Exam– A+ Graded Submission – 100- Verified Q&A for Success

Document preview thumbnail
Vista previa 3 fuera de 24 páginas

ERC Certification End-Term Exam– A+ Graded Submission – 100- Verified Q&A for Success

Vista previa del contenido

NERC Certification End-Term Exam– A+ Graded
Submission – 100% Verified Q&A for Success
If the MSSC for a BA is 800 MW, what is the DCS reporting threshold?



A) 240 MW



B) 640 MW



C) 840 MW



D) 300 MW - ✔✔B) 640 MW (80 %)



A BA that is part of a multiple BA Interconnection that is not receiving overlap regulation and uses a
fixed Frequency Bias Setting must have its calculated setting validated by the - ✔✔ERO (Electric
Reliability Organization)



The Frequency Bias Setting for a Balancing Area must be expressed in?



A) MW/0.1 Hz



B) MW/0.5 Hz



C) MW/0.01 Hz



D) MW/0.05 Hz - ✔✔A) MW/0.1 Hz



Units with nameplate ratings of _____ or greater should be equipped with governors.

,A) 25 MW



B) 15 MW



C) 10 MW



D) 50 MW - ✔✔C) 10 MW



There are how many ways to make adjustments for a time error correction?



A) 2



B) 3



C) 5



D) 6 - ✔✔A) 2



Who can serve as an Interconnection Time Monitor? - ✔✔Only Reliability Coordinators



BAs use ______ to automatically direct the loading of regulating reserves on their system. - ✔✔AGC
(Automatic Generation Control)



The MSSC for your BA is 650 MW. Your reporting threshold is > 520 MW. (650 x 80%). What is the
percent of recovery for the following situation?



Loss of a 575 MW unit

Pre-disturbance Ace = 150 MW

Post-recovery Ace = 10 MW - ✔✔+150 + (-575) = -425

, -425 + (x) = 10, x= 435



435/425= 100%



The MSSC for your BA is 650 MW. Your reporting threshold is >/equal to 520 MW. (650 x 80%) What is
the percent of recovery for the following situation?



Loss of a 600 MW unit

Pre-disturbance Ace = 150 MW

Post-recovery Ace = -50MW - ✔✔+150 + (-600) = -450



-450 + (x) = -50, x= 400



400/450= 89%



Units with nameplate ratings of 10 MW or greater should be equipped with governors which have a
droop of ______% - ✔✔5%,



All of the reasons listed below can be a cause of inadvertent accumulation except - ✔✔Market response



Each Balancing Area shall operate its AGC on ______, unless such operation is adverse to system or
Interconnection reliability. - ✔✔Tie-Line Frequency Bias



If a BA is unable to calculate ACE for more than _________ it shall notify its RC - ✔✔30 minutes



As a minimum, the BA must provide its System Operators with real-time values for all of the following
except ______ with each adjacent BA. - ✔✔MVAR flows

Información del documento

Subido en
29 de mayo de 2025
Número de páginas
24
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$7.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
4
Seguidores
0
Artículos
485
Última venta
8 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes