APPA CEFP SECTION 2 QUESTIONS AND ANSWERS Capital Renewal/Replacement - CORRECT ANSWER"A systematic management process of planning and budgeting for known future cyclical repair and replacement requirements that extend the life retain the usable condition of facilities and systems, not normally contained in the annual operating budget. Includes major activities that have a maintenance cycle in excess of one year (e.g., replace roofs, paint buildings, resurface roads)."

Vista previa del contenido

APPA CEFP SECTION 2 QUESTIONS AND ANSWERS
Capital Renewal/Replacement - CORRECT ANSWER✅✅✅"A systematic management process of
planning and budgeting for known future cyclical repair and replacement requirements that extend the
life retain the usable condition of facilities and systems, not normally contained in the annual operating
budget. Includes major activities that have a maintenance cycle in excess of one year (e.g., replace roofs,
paint buildings, resurface roads)."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Facilities Condition Index (FCI Index) - CORRECT ANSWER✅✅✅'A comparative industry
indicator/benchmark used to indicate the relative physical condition of a facility, group of buildings, or
entire portfolio "independent " of building type, construction type, type location, or cost."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Deferred Maintenance (DM) Backlog - CORRECT ANSWER✅✅✅"Total dollar amount of existing
maintenance repairs and required replacements (capital renewal) that were not accomplished when
they should have been, not funded in the current fiscal year, or otherwise deferred."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Strategic Capital Development Model - CORRECT ANSWER✅✅✅"Instead of periodic and stand-alone
studies of elements of the capital needs of an institution, this model defines six phases of an integrated
and comprehensive (" soup-to Nuts") planning process."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Facilities Condition Assessment - CORRECT ANSWER✅✅✅"Continuous systematic approach to
identifying assessing, prioritizing, and maintaining the specific maintenance, repair, renewal, and
replacement requirements for all facility assets."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]

, Facilities Audit - CORRECT ANSWER✅✅✅"Method of assessing existing buildings and infrastructure
to measure the extent of maintenance backlogs."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Recapitalization - CORRECT ANSWER✅✅✅"Periodic recurring costs for replacement/renewal
projects and one-time funding for improvements and programmatic projects."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Trade Based/ Central Shop Organization - CORRECT ANSWER✅✅✅"The plumbers report to one
supervisor. the electricians to another, and the HVAC mechanics to another. The trade staff is then
dispatched to jobs in any facility from the central pool of resources."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Zone based Organization - CORRECT ANSWER✅✅✅"Assigns a mixture of trade expertise to care for
a specific set of buildings"



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Function Based Organization - CORRECT ANSWER✅✅✅"Structured around the type of work. One
work group performs the preventive maintenance, while another group responds to service calls."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Time and Material Agreement - CORRECT ANSWER✅✅✅"A customer is charged a predetermined
hourly rate for labor plus the cost of materials and equipment needed for a job."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]

Información del documento

Subido en
29 de mayo de 2025
Número de páginas
15
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
STANGRADES
3.3
(15)
Vendido
103
Seguidores
2
Artículos
12022
Última venta
3 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes