In a two crane lift the center of gravity should be -Correct Answer Closer to the crane with the greatest capacity For rubber-tired cranes working on rubber, the part of the load chart governed by stability is based on what % of the crane's capacity? -Correct Answer 75% As a general rue on tandem crane lifts neither crane should be loaded greater than what % of net capacity -Correct Answer 75% On long boom cranes, what is the major effect of abruptly stopping a rapid swing? -Correct Answer Action may overturn the crane or collapse the boom The most important thing to remember when performing dual crane lifts is: -Correct Answer The cranes should not be loaded beyond 75% of their rated capacity The total weight of a loaded personnel platform and related rigging shall not exceed what % of the rated capacity for the radius and configuration of a crane or derrick -Correct Answer 50% Pre-operational inspections are necessary and required: -Correct Answer Enhance cranes safety by discovering discrepancies prior to operating. If a crane has to be level to within 1% of grade, the maximum allowable variation in grade in a horizontal distance of 20' would be: -Correct Answer 2.4''

Vista previa del contenido

Mobile Crane NCCER



Mobile Crane NCCER Study Guide 2025
In a two crane lift the center of gravity should be -Correct Answer ✔Closer to the crane
with the greatest capacity


For rubber-tired cranes working on rubber, the part of the load chart governed by
stability is based on what % of the crane's capacity? -Correct Answer ✔75%


As a general rue on tandem crane lifts neither crane should be loaded greater than what
% of net capacity -Correct Answer ✔75%


On long boom cranes, what is the major effect of abruptly stopping a rapid swing? -
Correct Answer ✔Action may overturn the crane or collapse the boom


The most important thing to remember when performing dual crane lifts is: -Correct
Answer ✔The cranes should not be loaded beyond 75% of their rated capacity


The total weight of a loaded personnel platform and related rigging shall not exceed
what % of the rated capacity for the radius and configuration of a crane or derrick -
Correct Answer ✔50%



Pre-operational inspections are necessary and required: -Correct Answer ✔Enhance
cranes safety by discovering discrepancies prior to operating.


If a crane has to be level to within 1% of grade, the maximum allowable variation in
grade in a horizontal distance of 20' would be: -Correct Answer ✔2.4''




Mobile Crane NCCER

, Mobile Crane NCCER


On a standard running rope, how many broken wires are cause for considering
replacement? -Correct Answer ✔3 broken wires in one strand in one lay


On a standing rope, how many wires need to be broken at an end connections before
replacing? -Correct Answer ✔2


According to ASME B30.5, mobile crane standard, how many randomly distributed
broken wires in rotation- resistant- rope is cause for considering replacement of the
rope? -Correct Answer ✔2 broken wire in 6 rope diameters



The lay length of a wire rope is defined as -Correct Answer ✔Distance of one strand as it
makes one revolutions


which of the following signifies the grade of steel used in wire rope? -Correct Answer
✔XIP (Extra Improved Plow Steel)



Which end fitting has the highest efficiency rating? -Correct Answer ✔Swaged Sockets



Which hitch provides the greatest lifting capacity? -Correct Answer ✔Basket Hitch


When placing a shackle on a crane hook the correct procedure is: -Correct Answer
✔Place the shackle pin in the hook


Its time to replace wire rope when_______% of the diameter of outside wire is worn
away? -Correct Answer ✔5%


Never use a fiber core wire rope when working in temperatures exceed: -Correct Answer
✔180 degrees


Mobile Crane NCCER

Información del documento

Subido en
23 de mayo de 2025
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
PossibleA
3.9
(150)
Vendido
1066
Seguidores
651
Artículos
13924
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes