• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 31 páginas
Examen

Civil Engineering Internship Report Sample

Document preview thumbnail
Vista previa 4 fuera de 31 páginas

CIVIL ENGINEERING INTERNSHIP REPORT SAMPLE

Vista previa del contenido

CIVIL ENGINEERING

INTERNSHIP REPORT SAMPLE


THE UNIVERSITY OF LAHORE
DEPARTMENT OF CIVIL ENGINEERING

INTERNSHIP REPORT




NAME: MUHAMMAD FAROOQ


REGISTRATION No.: BSCE 01143009


ADVISOR: Dr. AMIR FAROOQ


SPONSORING COMPANY: WAREESHA ENTERPRISES


Project Name:
House Construction of Proposed 3 Units of 2 Kanal Villas (Phase 2) At Phase VI, DHA
Lahore
Duration: 2nd June 2017 to 1st July 2017

Date of Submission: 17th November 2017

, Acknoldgment




ACKNOLDGEMENT

The field of construction has always been a source of inspiration for me during
my entire academic career. To work in a construction site, to acquaint with its
working mechanism was always a point of interest for me and Allah gave me a
golden opportunity to complete my internship at House Construction of
Proposed 3 Units of 2 Kanal Villas (Phase 2) At Phase VI, DHA Lahore with
WAREESHA ENTERPRISES. I had a general idea about the construction site,
but once I practically started the internship in construction field I observed much
about site. I learned a lot about the overall construction arena. This expanded my
vision about the construction sector.

This report is a thorough essence of my rigorous studies which I undergone
through in a period of 04 weeks in DEFENCE RAYA GOLF & COUNTRY
CLUB

I have exclusively studied and observed the operations/ functioning of the
company and tried my best to abreast myself with all the dimensions of the
company. The purpose of this report is to evaluate the performance of
WAREESHA ENTERPRISES in diversified avenues and give concrete
recommendation for further improvement. Although the company is functioning
satisfactory, but the path to ultimate success is still full of threats and hurdles. It
was a great experience to work there and to be a significant part of the company.

, Index




Table of Contents

Chapter # 1 ........................................................................................................................... 1

Introduction .......................................................................................................................... 1

1.1. Project Description: ................................................................................................... 1
1.2. Introduction to Organization: .................................................................................... 1
1.2.1) Introduction of Staff Members: ...................................................................... 2

1.2.2) Organization Department ............................................................................... 2

1.2.3) Machinery ...................................................................................................... 2

1.2.4) Some Previous Projects: ................................................................................. 3

Chapter # 2 ........................................................................................................................... 4

Activities Participated: ......................................................................................................... 4

2.1. Schedule of Internship:.............................................................................................. 4
2.2. Site Work: ................................................................................................................. 4
2.3. Section of the Company I Was Working In: ............................................................. 4
2.4. Summary of Office Work Activities: ........................................................................ 4
2.5. Excavation for Footing .............................................................................................. 5
2.6. Lean Concrete: .......................................................................................................... 5
2.7. Steel Fixing For Footing ........................................................................................... 6
2.8. Steel Fixing In Footing and Column: ........................................................................ 6
2.9. Concrete Pouring In Footing And Column: .............................................................. 6
2.10. Back Filling ............................................................................................................... 6
2.11. Retaining Walls in Foundations: ............................................................................... 7
2.12. Construction Material:............................................................................................... 7
2.13. Details of Ground Floor: ........................................................................................... 7
2.14. My Duties and Responsibilities: ................................................................................ 8
Chapter # 3 ......................................................................................................................... 10

Activities Observed ............................................................................................................ 10

, Index
3.1) Concrete Work: ....................................................................................................... 10
3.2) Concrete Making Materials: .................................................................................... 11
3.2.1) Aggregate: .................................................................................................... 11

3.2.2) Sand:............................................................................................................. 11

3.2.3) Cement: ........................................................................................................ 11

Chapter # 4 ......................................................................................................................... 12

Correlation of Activities with Standards ............................................................................ 12

4.1. For Slump of Hydraulic Cement Concrete:............................................................. 12
Results Of Slump In Field: ......................................................................................... 12

4.2. Standard Test Method For Rebound Number Of Hardened Concrete: ................... 13
4.3. For Reinforcement:.................................................................................................. 14
4.4. For Concrete Mix Design:....................................................................................... 15
Chapter # 5 ......................................................................................................................... 16

Study of Drawings .............................................................................................................. 16

5.1. Some Drawings Specifications: ............................................................................... 16
5.1.1. Lap Length: .................................................................................................. 16

5.1.2. Structural Element (Aggregate Size): .......................................................... 16

5.1.3. Concrete Protection to Reinforcement: ........................................................ 17

Chapter # 6 ......................................................................................................................... 18

Difficulties Faced ............................................................................................................... 18

Chapter # 7 ......................................................................................................................... 19

Summary and Knowledge Gained ..................................................................................... 19

Appendix ............................................................................................................................ 20




List of Figures

Figure 1: Ground Floor Plan .............................................................................................. 20

Información del documento

Subido en
20 de mayo de 2025
Número de páginas
31
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$43.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
68
Seguidores
13
Artículos
2940
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes