CSLB Concrete C8 License Practice Test #4
questions with answers

Which of the following tools is sufficient for the compacting of concrete in a
|| || || || || || || || || || || || ||




small project? - CORRECT ANSWERS ✔✔Hand tamper
|| || || || || || ||




At 50°F, how long should the concrete be protected to attain sufficient
|| || || || || || || || || || ||




strength (normally 500 Psi)? - CORRECT ANSWERS ✔✔48 Hours
|| || || || || || || || ||




Which of the following arrangements can be used to keep the concrete at the
|| || || || || || || || || || || || ||



recommended 50°F temperature for allowing proper setting? - CORRECT
|| || || || || || || || ||




ANSWERS ✔✔Heaters OR Thermal blankets
|| || || || ||




What is the 'Swell Factor' for sandy loam soil when performing excavation
|| || || || || || || || || || ||




work for a concrete structure? - CORRECT ANSWERS ✔✔About 1.1 to 1.2
|| || || || || || || || || || || ||




Which of the following building specification and cost estimating standard
|| || || || || || || || ||




systems is accepted as ASTM standard? - CORRECT ANSWERS ✔✔UniFormat
|| || || || || || || || || ||



System
||




Which of the following factors directly impact each other in the process of
|| || || || || || || || || || || ||



cost estimation for a concrete building project? - CORRECT ANSWERS
|| || || || || || || || || ||




✔✔Interest rate, Holding cost, Cost escalation
|| || || || || ||

,Which of the following points are true about Work Breakdown Structure
|| || || || || || || || || ||



(WBS) in the planning of a construction project? - CORRECT ANSWERS
|| || || || || || || || || || ||




✔✔Decomposing of a task into doable, measureable, estimable , and
|| || || || || || || || || ||



schedulable units
|| ||




Which of the following statements is correct about the finishing of a concrete?
|| || || || || || || || || || || ||




- CORRECT ANSWERS ✔✔Concrete should be finished once bleed water and
|| || || || || || || || || || ||




surface sheen disappear
|| || ||




An excavation of 10 cubic meters is done on any soil. Which of the following
|| || || || || || || || || || || || || ||



statements is true about the refilling volume of that excavation with the same
|| || || || || || || || || || || || ||




type of soil material? - CORRECT ANSWERS ✔✔More than 10 cubic meters
|| || || || || || || || || || || ||




What type of release oil is commonly used for the construction of wooden
|| || || || || || || || || || || ||




forms in the concrete industry? - CORRECT ANSWERS ✔✔Paraffin base oil
|| || || || || || || || || || ||




Initial and final setting time values of concrete are normally considered from:
|| || || || || || || || || || ||




- CORRECT ANSWERS ✔✔Mixing of water into cement material
|| || || || || || || || ||




Form-exposed corners and edges are commonly beveled to avoid any || || || || || || || || ||




chipping by using: - CORRECT ANSWERS ✔✔Chamfer strips
|| || || || || || || ||




Which of the following are the basic crafts used in estimating the concrete
|| || || || || || || || || || || ||




construction cost in the industry? - CORRECT ANSWERS ✔✔Ironworker,
|| || || || || || || || ||



Carpenter, Teamster, Cement mason
|| || || ||

, Which of the results of a concrete slump test has the highest workability? -
|| || || || || || || || || || || || ||




CORRECT ANSWERS ✔✔True Slump
|| || || ||




Explanation:
Workability is the ease or difficulty of placing concrete in a particular
|| || || || || || || || || || ||



location. For example, a stiff but plastic mix with large aggregate would be
|| || || || || || || || || || || || ||



workable in large open form but not in a wall with closely spaced
|| || || || || || || || || || || || ||



reinforcement. Please note that the slump test is NOT a measure of
|| || || || || || || || || || || ||



workability, and it should not be used to compare mixes of entirely different
|| || || || || || || || || || || || ||



proportions or containing different kinds of aggregate.
|| || || || || || ||




What is the maximum depth of a foundation footing commonly used in
|| || || || || || || || || || ||




concrete construction? - CORRECT ANSWERS ✔✔78"
|| || || || || ||




Which of the following factors should be estimated as earthwork components
|| || || || || || || || || ||




in project planning? - CORRECT ANSWERS ✔✔ALL OF THESE
|| || || || || || || || ||




-Rough grading, Excavation, Soil backfilling
|| || || ||




-Soil compacting, Fill material compacting, Excavation
|| || || || ||




-Excavated soil hauling, Soil backfilling, Rough grading
|| || || || || ||




According to American Concrete Institute ACI-301 standard, what is the
|| || || || || || || || ||



maximum volume of concrete that requires a strength test of concrete? -
|| || || || || || || || || || || ||




CORRECT ANSWERS ✔✔Each 100 cubic yards
|| || || || || ||

Información del documento

Subido en
18 de mayo de 2025
Número de páginas
19
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$21.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EXAMSTUDYPLUG
4.5
(242)
Vendido
392
Seguidores
107
Artículos
20959
Última venta
1 semana hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes