• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

Codes & Zoning Exam Questions With Complete Solutions

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

CODES & ZONING EXAM QUESTIONS WITH COMPLETE SOLUTIONS LA State Fire Marshal: - ANSWER-effective as of July 1, 2017: plans & specifications for every structure built or remodeled in Louisiana must be drawn in accordance with the requirements of the 2015 NFPA Life and Safety Code and also in accordance with requirements of 2015 International Building Code Whenever multiple codes conflict: - ANSWER-follow the more stringent and remember that codes are the minimum Occupational Safety & Health Administration (OSHA): - ANSWER--assures safe, healthful working conditions by setting and enforcing standards and providing training -part of the US Department of Labor -covers requirements for special work environments (constructions sites, shipyards, sawmills, bakeries, commercial driving, power companies) OSHA includes standards and regulations for: - ANSWER--walking/work surfaces (ladders, stairs, etc.) -means of egress -power platforms and man-lifts -ventilation and noise exposure -radiation and hazardous exposure Americans with Disabilities Act (ADA): - ANSWER-mandates accessibility via minimum standards for ramps, railings, elevators, plumbing fixtures, doors and openings -accessible route: continuous, unobstructed path connecting all accessible elements and spaces in a building Code enforcement: - ANSWER--enforced under police powers of the state -delegated to a local jurisdiction -administered by building officials, fire marshals, department of public works Process of code enforcement: - ANSWER-1. submit building plans 2. fire marshal approval/permit issued 3. building inspections during construction (foundation, mech, elec, plumb, and final inspection) 4. certificate of occupancy 5. if permit denied, board of appeals Commercial projects in Baton Rouge: - ANSWER--submitted to DPW and State Fire Marshal -Fire Marshal reviews NFPA, IBC, ADA Residential projects in Baton Rouge: - ANSWER--submitted to DPW

Vista previa del contenido

CODES & ZONING EXAM QUESTIONS
WITH COMPLETE SOLUTIONS
LA State Fire Marshal: - ANSWER-effective as of July 1, 2017: plans & specifications
for every structure built or remodeled in Louisiana must be drawn in accordance with
the requirements of the 2015 NFPA Life and Safety Code and also in accordance with
requirements of 2015 International Building Code

Whenever multiple codes conflict: - ANSWER-follow the more stringent and remember
that codes are the minimum

Occupational Safety & Health Administration (OSHA): - ANSWER--assures safe,
healthful working conditions by setting and enforcing standards and providing training
-part of the US Department of Labor
-covers requirements for special work environments (constructions sites, shipyards,
sawmills, bakeries, commercial driving, power companies)

OSHA includes standards and regulations for: - ANSWER--walking/work surfaces
(ladders, stairs, etc.)
-means of egress
-power platforms and man-lifts
-ventilation and noise exposure
-radiation and hazardous exposure

Americans with Disabilities Act (ADA): - ANSWER-mandates accessibility via minimum
standards for ramps, railings, elevators, plumbing fixtures, doors and openings
-accessible route: continuous, unobstructed path connecting all accessible elements
and spaces in a building

Code enforcement: - ANSWER--enforced under police powers of the state
-delegated to a local jurisdiction
-administered by building officials, fire marshals, department of public works

Process of code enforcement: - ANSWER-1. submit building plans
2. fire marshal approval/permit issued
3. building inspections during construction (foundation, mech, elec, plumb, and final
inspection)
4. certificate of occupancy
5. if permit denied, board of appeals

Commercial projects in Baton Rouge: - ANSWER--submitted to DPW and State Fire
Marshal
-Fire Marshal reviews NFPA, IBC, ADA

, Residential projects in Baton Rouge: - ANSWER--submitted to DPW Permit &
Inspection division
-BR residential code is a modified version of IBC + 7 other codes

Permitting process: - ANSWER-how local governments enforce building codes--the
architect and builder submit plans for review before a permit will be issued

Building codes regulate issues of: - ANSWER--life safety
-fire safety
-structural safety
-health and welfare
-property protection

Building codes refer to: - ANSWER--the structure itself
-how it is constructed
-provisions required to protect people and stuff

Codes are generally _____ (not perspective); they describe _____ instead of requiring
specific materials or products. - ANSWER-performance based; building function

How buildings are categorized: - ANSWER--occupancy group (how is it being used)
-occupancy load (the number of people)
-construction type (flammability of material)

The building categorizations combined determine: - ANSWER--building area and height
limitations
-minimum number of exits and egress widths
-fire rating of construction assemblies

Occupancy group combined with construction type: - ANSWER-determines allowable
floor area and maximum height both in feet and number of stories

Construction Type I: - ANSWER-the most fire resistant and includes masonry,
reinforced concrete, and fire protected steel

Construction Type V: - ANSWER-the least fire resistant such as buildings framed with
small wood members

Fire Resistance Ratings: - ANSWER-specify the time in hours and fractions of an hour
that a material or assembly will resist fire exposure
-more fire resistive, the more expensive
-determined by the ASTM (American Society for Testing and Materials)

When a building contains two or more occupancies, it is considered _____ and each
type must be separated by a _____. - ANSWER-Mixed Occupancy; Fire Rated
Separation

Información del documento

Subido en
15 de mayo de 2025
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$20.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Freshy
3.6
(11)
Vendido
64
Seguidores
4
Artículos
6965
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes