• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 27 páginas
Examen

WGU C215 Study Guide - FINAL

Document preview thumbnail
Vista previa 3 fuera de 27 páginas

©JASONMcCONNELL 2025 ALL RIGHTS RESERVED 1 WGU C215 Study Guide - FINAL Total Quality Management (TQM) Philosophy - ANS 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Process Capability Index (Cpk) - ANS Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Six Sigma - ANS A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. Design Capacity - ANS The theoretical maximum output of a system in a given period under ideal conditions. Location Analysis - ANS proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors. The technique for determining location decisions. ©JASONMcCONNELL 2025 ALL RIGHTS RESERVED 2 Line Processes - ANS A type of process used to produce a large volume of a standardized product. ■ Limited customization and high volume Batch Processes - ANS A type of process used to produce a small number of products in groups or batches based on customer orders or specifications. ■ High customization moderate volume Project Processes - ANS A type of process used to make a one-at-a-time product exactly to customer specifications. ■ Most custom and lowest volume Continuous Processes - ANS A type of process that operates continually to produce a high volume of a fully standardized product. - No customization and as high a volume as possible Bottleneck - ANS Longest task in the process. Flexible Manufacturing System (FMS) - ANS A type of automated system that combines the flexibility of intermittent operations with the efficiency of continuous operations. Output/Input Control - ANS A technique for monitoring the flow of jobs between work centers. ©JASONMcCONNELL 2025 ALL RIGHTS RESERVED 3 Value-Added - ANS The net increase created during the transformation of inputs into final outputs. Hybrid Layouts - ANS Layouts that combine characteristics of process and product layouts. - Group technology layouts. - Cell technology layouts. - Grocery stores use hybrid layouts Relationship Chart (REL) - ANS Table that reflects opinions of managers with regard to the importance of having any two departments close together. Rectilinear Distance - ANS The shortest distance between two locations using north-south and east-west movements. From-To Matrix - ANS Table that gives the number of trips or units of product moved between any pair of departments. Block Plan - ANS Schematic showing the placement of resources in a facility. Mean Observed Times - ANS The average of the observation times for each of the work elements. Normal Time - ANS The mean observed time multiplied by the performance rating factor by the frequency of occurrence. Standard Time - ANS The length of time it should take a qualified worker using appropriate process and tools to complete a specific job, allowing time for personal fatigue and unavoidable delays.

Vista previa del contenido

©JASONMcCONNELL 2025 ALL RIGHTS RESERVED




WGU C215 Study Guide - FINAL




Total Quality Management (TQM) Philosophy - ANS 1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality



Process Capability Index (Cpk) - ANS Basic function of Six Sigma. Measures the process
potential and performance of processes. The higher the range of Cpk, the improved is the
ability of the process to complete its necessities.



Six Sigma - ANS A disciplined, data-driven approach and methodology for eliminating defects
(driving toward six standard deviations between the mean and the nearest specification limit)
in any process - from manufacturing to transactional and from product to service.



Design Capacity - ANS The theoretical maximum output of a system in a given period under
ideal conditions.



Location Analysis - ANS proximity to customers, transportation, source of labor, community
attitude, proximity to suppliers, and many other factors.


The technique for determining location decisions.
1

, ©JASONMcCONNELL 2025 ALL RIGHTS RESERVED




Line Processes - ANS A type of process used to produce a large volume of a standardized
product.


■ Limited customization and high volume



Batch Processes - ANS A type of process used to produce a small number of products in
groups or batches based on customer orders or specifications.


■ High customization moderate volume



Project Processes - ANS A type of process used to make a one-at-a-time product exactly to
customer specifications.


■ Most custom and lowest volume



Continuous Processes - ANS A type of process that operates continually to produce a high
volume of a fully standardized product.


- No customization and as high a volume as possible



Bottleneck - ANS Longest task in the process.



Flexible Manufacturing System (FMS) - ANS A type of automated system that combines the
flexibility of intermittent operations with the efficiency of continuous operations.



Output/Input Control - ANS A technique for monitoring the flow of jobs between work
centers.



2

, ©JASONMcCONNELL 2025 ALL RIGHTS RESERVED


Value-Added - ANS The net increase created during the transformation of inputs into final
outputs.



Hybrid Layouts - ANS Layouts that combine characteristics of process and product layouts.


- Group technology layouts.
- Cell technology layouts.
- Grocery stores use hybrid layouts



Relationship Chart (REL) - ANS Table that reflects opinions of managers with regard to the
importance of having any two departments close together.



Rectilinear Distance - ANS The shortest distance between two locations using north-south
and east-west movements.



From-To Matrix - ANS Table that gives the number of trips or units of product moved
between any pair of departments.



Block Plan - ANS Schematic showing the placement of resources in a facility.



Mean Observed Times - ANS The average of the observation times for each of the work
elements.



Normal Time - ANS The mean observed time multiplied by the performance rating factor by
the frequency of occurrence.



Standard Time - ANS The length of time it should take a qualified worker using appropriate
process and tools to complete a specific job, allowing time for personal fatigue and unavoidable
delays.


3

Información del documento

Subido en
1 de mayo de 2025
Número de páginas
27
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StarGuide
3.8
(6)
Vendido
22
Seguidores
0
Artículos
2585
Última venta
1 mes hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes