Terms in this set (115)
All heating, combustion, 170 ̊ F
and cooking equipment
shall be provided with
insulation or the building
construction shall be fire
protected, so that during
operation the surface of
combustible construction
materials will not be
raised to a temperature
higher than ____.
Acceptance tests: Boilers Inspected and tested.
shall not be placed in
operation upon
completion of
construction until they
have been ____ and an
equipment use permit
has been issued by the
commissioner.
https://quizlet.com/1036636594/p-99-low-psi-oil-burner-operator-2025-real-exam-questions-most-tested-questions-and-correct-answers-100-acc… 1/13
, 4/28/25, 8:04 AM P-99 / Low PSI Oil Burner Operator 2025 REAL EXAM QUESTIONS |MOST TESTED QUESTIONS AND CORRECT ANSWE…
Periodic boiler Once a year.
inspections: All boilers
shall be inspected at
least ____ including
chimney connections.
Owner's annual Written statement.
statement: The owner of
each boiler that is subject
to periodic inspections
shall file an annual ____
with the commissioner,
specifying the location of
each boiler and
arrangement for
inspection.
What three things must (1) Tightness of liquid fuel piping.
be tested for any fuel
burning and storage (2) Tightness of fuel oil storage tanks.
installation before the
system can be operated? (3) Tightness of gas distribution piping.
What are instruction Cards giving complete instructions for care and
cards for oil burning operation that are permanently located near the
systems? equipment.
Every oil burning COF
installation that is not
fully automatic or
requires preheating shall
be operated by, or under,
the direct supervision of
a person holding a ____
issued by the fire
commissioner.
https://quizlet.com/1036636594/p-99-low-psi-oil-burner-operator-2025-real-exam-questions-most-tested-questions-and-correct-answers-100-acc… 2/13
P-99 / Low PSI Oil Burner Operator 2025 REAL
EXAM QUESTIONS |MOST TESTED QUESTIONS
AND CORRECT ANSWERS |100%
ACCURATE|GET IT RIGHT!!
Save
Terms in this set (115)
All heating, combustion, 170 ̊ F
and cooking equipment
shall be provided with
insulation or the building
construction shall be fire
protected, so that during
operation the surface of
combustible construction
materials will not be
raised to a temperature
higher than ____.
Acceptance tests: Boilers Inspected and tested.
shall not be placed in
operation upon
completion of
construction until they
have been ____ and an
equipment use permit
has been issued by the
commissioner.
https://quizlet.com/1036636594/p-99-low-psi-oil-burner-operator-2025-real-exam-questions-most-tested-questions-and-correct-answers-100-acc… 1/13
, 4/28/25, 8:04 AM P-99 / Low PSI Oil Burner Operator 2025 REAL EXAM QUESTIONS |MOST TESTED QUESTIONS AND CORRECT ANSWE…
Periodic boiler Once a year.
inspections: All boilers
shall be inspected at
least ____ including
chimney connections.
Owner's annual Written statement.
statement: The owner of
each boiler that is subject
to periodic inspections
shall file an annual ____
with the commissioner,
specifying the location of
each boiler and
arrangement for
inspection.
What three things must (1) Tightness of liquid fuel piping.
be tested for any fuel
burning and storage (2) Tightness of fuel oil storage tanks.
installation before the
system can be operated? (3) Tightness of gas distribution piping.
What are instruction Cards giving complete instructions for care and
cards for oil burning operation that are permanently located near the
systems? equipment.
Every oil burning COF
installation that is not
fully automatic or
requires preheating shall
be operated by, or under,
the direct supervision of
a person holding a ____
issued by the fire
commissioner.