Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 49 páginas
Examen

CMIT EXAM NEWEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+.pdf

Document preview thumbnail
Vista previa 4 fuera de 49 páginas

CMIT EXAM NEWEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+.pdf

Vista previa del contenido

CMIT EXAM STUDY | NEWEST ACTUAL m m m m m




EXAM COMPREHENSIVE QUESTIONS A m m m




ND VERIFIED ANSWERS GRADED A+ | 1
m m m m m m




00% PASS | 2025 UPDATE! m m m m




When delay is due to cause, beyond the control of both the owner and
m m m m m m m m m m m m m



mthe contractor, an extension in contract time in the amount equal to t
m m m m m m m m m m m m



he time lost on the critical path shall be the contractor's sole and excl
m m m m m m m m m m m m m



usive remedy for such delay.
m m m m




True False - ✔✔✔ Correct Answer > True
m m m m m m m




The traditional delivery system is characterized by executing the major
m m m m m m m m m m



phases of a project in: m m m m




A) An overlapping concept
m m




B) A linear sequence
m m




C) A fast track method
m m m




D) All of the above - ✔✔✔ Correct Answer > B) A linear sequence
m m m m m m m m m m m m




The most common basis of CM liability to a trade contractor with who
m m m m m m m m m m m m



m the CM has no contractual relationship is negligent performance of t
m m m m m m m m m m m



he CM's:
m




A) Cost estimating m

,B) Inspection of work m m




C) Project coordination and scheduling
m m m




D) All of the above -
m m m m



m✔✔✔ Correct Answer > C) Project coordination and scheduling
m m m m m m m m




A key advantage of the traditional delivery approach is:
m m m m m m m m




A) With the traditional delivery system, the cost of the constructio
m m m m m m m m m



n phase is known before construction starts.
m m m m m m




B) Facility features are fully determined & specified.
m m m m m m




C) When the construction contract is signed, the major risk belongs t
m m m m m m m m m m



o the contractor.
m m




D) All of the above -
m m m m



m✔✔✔ Correct Answer > B) Facility features are fully determined
m m m m m m m m m m


& specified.
m




The sole source of a CM's liability is to its client. Tr
m m m m m m m m m m m




ue False - ✔✔✔ Correct Answer > True
m m m m m m m




A CM's liability is determined solely by whether or not the CM perform
m m m m m m m m m m m m



ed according to the required standard of care.
m m m m m m m




True False - ✔✔✔ Correct Answer > False
m m m m m m m




To the extent that a CM assumes the designer's responsibilities for cost
m m m m m m m m m m m



mestimates, the CM faces the same liability as similarly situated designe
m m m m m m m m m m



rs.

,True False - ✔✔✔ Correct Answer > True
m m m m m m m




In the absence of both a limit on construction costs and a warranty fo
m m m m m m m m m m m m m



r the accuracy of the cost estimate, a project cost overrun will cause t
m m m m m m m m m m m m m



he CM to lose their fee.
m m m m m




True False - ✔✔✔ Correct Answer > False
m m m m m m m




Most owner- m



CM contracts commonly state that the CM's contractual obligations are
m m m m m m m m m



msolely for the benefit of the owner.
m m m m m m




True False - ✔✔✔ Correct Answer > True
m m m m m m m




Most publicly funded projects require which of the following inclusions
m m m m m m m m m m



as part of their contract obligations?
m m m m m




A) BIM model m




B) Performance bond m




C) Mock-up model m




D) LEED Gold - ✔✔✔ Correct Answer > B) Performance bond
m m m m m m m m m




A Public-
m



Private Partnership (P3) project is usually considered by a public entity
m m m m m m m m m m m



for which of the following primary reasons:
m m m m m m




A) Better design m




B) Incorporate environmental requirements m m




C) Lack of funding m m

, D) Meet sustainability goals -
m m m



m✔✔✔ Correct Answer > C) Lack of funding
m m m m m m m




What is the main advantage of private sector firms in managing their pr
m m m m m m m m m m m m



ocurement process? m




A) Price
B) Contract terms m




C) Bonding
D) Flexibility - ✔✔✔ Correct Answer > D) Flexibility
m m m m m m m




Once the PMP is written and approved, it should not be changed.
m m m m m m m m m m m m




True False - ✔✔✔ Correct Answer > False
m m m m m m m




What is one of the primary owner benefits of program management?
m m m m m m m m m m




A) Contractor selection m




B) Leveraged purchasing m




C) Partnering
D) Aligned dispute resolution - m m m



m✔✔✔ Correct Answer > B) Leveraged purchasing
m m m m m m




Project management and program management are similar in that the
m m m m m m m m m



y both use
m m . m




A) Lean Six Sigma m m

Libro relacionado
 image
Pearson Education Nursing
Editorial: 2015 ISBN: 9780133772319 Edición: Desconocido

Información del documento

Subido en
26 de abril de 2025
Número de páginas
49
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$20.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
10
Seguidores
0
Artículos
501
Última venta
3 meses hace


Reseñas de compradores verificados




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes