CSI - CDT study terms. Questions and
Answers 100% Solved
Hard Cost Site acquisition, surveys, preparation
Construction
FFE
Construction Budgets 1 Cost per measured unit
2 Component cost
3 Systems
CSI Uniformat Preliminary organizational classification system Breaks down facility into
systems such as Substructure, shell, interiors, demo, etc... Based on one table from the
OmniClass
Facility Programming Functions Function
Form
Economy
Time
,Project Delivery Factors Extent
Cost
Time
Fast Track A scheduling tool used to delver the construction documents to the contractor
in phased packages, such as foundations, shell, frame, interiors, FFE.
Design Bid Build Traditional project construction process with AE providing documents
for bid to a field of contractors
Open Bid Any qualifying bidder can submit a proposal on the project
Closed Bid Bidders limited to invited or prequalified contractors only`
CSI MasterFormat Classifies facilities in terms of work results: the results of labor
applied to products and materials
, CSI SectionFormat Three part organizational method for specifications
CSI PageFormat Abbreviated specs organized in paragraph format.
CSI GeenFormat system of presenting sustainable information about products in a
consistent and rigorous format
Project Teams Owner, Design, Contractor, Supplier
OMNI Class Concepts and information related to the built environment. Series of tables
which organize information from a different conceptual viewpoints
Four c's Clear, Concise, Correct, Complete
Green Building Meeting the facilities needs without compromising the ability of future
generation to meet their needs
Answers 100% Solved
Hard Cost Site acquisition, surveys, preparation
Construction
FFE
Construction Budgets 1 Cost per measured unit
2 Component cost
3 Systems
CSI Uniformat Preliminary organizational classification system Breaks down facility into
systems such as Substructure, shell, interiors, demo, etc... Based on one table from the
OmniClass
Facility Programming Functions Function
Form
Economy
Time
,Project Delivery Factors Extent
Cost
Time
Fast Track A scheduling tool used to delver the construction documents to the contractor
in phased packages, such as foundations, shell, frame, interiors, FFE.
Design Bid Build Traditional project construction process with AE providing documents
for bid to a field of contractors
Open Bid Any qualifying bidder can submit a proposal on the project
Closed Bid Bidders limited to invited or prequalified contractors only`
CSI MasterFormat Classifies facilities in terms of work results: the results of labor
applied to products and materials
, CSI SectionFormat Three part organizational method for specifications
CSI PageFormat Abbreviated specs organized in paragraph format.
CSI GeenFormat system of presenting sustainable information about products in a
consistent and rigorous format
Project Teams Owner, Design, Contractor, Supplier
OMNI Class Concepts and information related to the built environment. Series of tables
which organize information from a different conceptual viewpoints
Four c's Clear, Concise, Correct, Complete
Green Building Meeting the facilities needs without compromising the ability of future
generation to meet their needs