Examen

GENERAL CONTRACTOR LICENSE IN ARIZONA QUESTIONS WITH 100% VERIFIED ANSWERS

Document preview thumbnail
Vista previa 4 fuera de 41 páginas

GENERAL CONTRACTOR LICENSE IN ARIZONA QUESTIONS WITH 100% VERIFIED ANSWERS

Vista previa del contenido

GENERAL CONTRACTOR LICENSE IN ARIZONA
QUESTIONS WITH 100% VERIFIED ANSWERS
When a repair must be performed in a emergency situation, when shall the permit application
be submitted? - ✔✔The next working business day
Section 105.2.1 Emergency Repairs



Once the permit has been issued, how long is it valid? - ✔✔180 days
Section 105.5- Expiration



How long should a permit remain at the site of the work? - ✔✔Until the completion of the
project
Section 105.7 Placement of permit



What included within the "Exterior wall envelope"? - ✔✔flashing intersections with
dissimilar materials, corners, end details, control joints, intersections at roofs, eaves or
parapets, means of drainage, water-resistive membranes and details around openings.



Built-Up roof covering consist of - ✔✔Two or more layers of felt cemented together and
surfaced with a cap sheet, mineral aggregate, smooth coating or similar surfacing material
Chapter 2- Definition-Built-up Roof covering


Positive roof drainage will ensure drainage of the roof within ___ hours of precipitation -
✔✔48 hours
Chapter 2 Positive roof drainage



An example of a live load on a roof includes? - ✔✔During maintenance by workers, during
the life of the structure by movable objects, and by the use and occupancy of the roof for roof
gardens or assembly areas

,Chap 2 Live loads, ROOF


A _____ is the process of installing an additional roof covering over a prepared existing roof
covering without removing the existing roof. - ✔✔Roof Recover
Chap 2 Definitions roof recover


Parapet walls shall be not less than _____ inches above the point where the roof surface and
the wall intersect - ✔✔30 inches
Section 705.11.1 Parapet Construction



What is the requirement for combustible roof insulation? - ✔✔It must be covered by an
approved roof covering
Section 720.5 roof insulation


An opening not less than 20"x30" shall be provided to any attic area having a clear height of
over_____ - ✔✔30 inches
Section 1208.2 Access to Unoccupied Spaces- Attics Spaces


Flashing shall be installed at the perimeters of exterior door and window assemblies,
penetrations and terminations of exterior wall assemblies, and what other locations? -
✔✔Exterior wall intersections with roofs, chimneys, porches, decks, balconies and similar
projections and at built-in gutters and similar locations where moisture could enter the wall
Section 1404.4 Installation of wall covering flashing


When a scupper is used as secondary roof drainage, what is the minimum opening size of the
scupper? - ✔✔4 inches
Section 1502.3 Scuppers


A cricket shall be installed where a roof penetration is greater than ___ inches wide when
measured perpendicular to the slope? - ✔✔30 inches

,Section 1503.5 Cricket and Saddles


A building with aggregate roofing in an area with a nominal design wind speed of 110 mph in
exposure category C can have a maximum roof height of how many feet - ✔✔No permitted
Table 1504.8 Table for Maximum allowed mean roof height permitted for buildings aggregate
on the roof outside an HVHZ


How many layers of underlayment are required for an asphalt shingle roof with a slope of 2:12?
- ✔✔2 layers
Section 1507.2.2- Asphalt Shingles Slope


How far into asphalt shingle roofing materials shall fasteners penetrate into the roof sheathing?
- ✔✔Minimum of 3/4"
Section 1507.2.5 Fasteners


An ice barrier shall extend from the lowest edge of the roof surface a point at least ___ inside
the exterior wall line of the building - ✔✔24 inches
Section 1507.2.1 Ice barrier



What is the minimum thickness, in inches, of cap flashing for a roof? - ✔✔.019 inches
Section 1507.2.8.1 Base and cap flashing


For a tile roof with a slope of 5 in 12, what is the minimum number of layers of underlayment
and lap? - ✔✔1 layer lapped 2 inches
Table 1507.1.1(2) - Clay and concrete tile



Valley flashing shall extend at least ____ from the centerline of the valley each way. - ✔✔11
inches
Section 1507.3.9 - Flashing

, What is the minimum roof slope allowed for the installation of standing-seam metal roof
panels? - ✔✔1/4 unit vertical in 12 horizontal
Section 1507.4.2- Metal Roof Panels-Deck slope #3



What is the head lap of slate shingle installed on a roof that is 5 in 12? - ✔✔4 inches
Table 1507.7.6 Slate Shingle Head Lap



What is the minimum slope allowed for the installation of wood shingles? - ✔✔3 units
vertical in 12 units horizontal
Section 1507.8.2 Wood shingles - Deck Slope


What is the minimum nominal thickness of spaced sheathing boards used as decking for wood
shakes? - ✔✔1 inch
Section 1507.9.1-wood shakes-deck requirements


A 90 clock tower which is 500 sf in area would be required to be constructed of and supported
on what type of construction? - ✔✔Type I or II conctruction
Section 1510.5 Towers, spires, domes and cupolas


Roof replacement is required to remove all layers of roofing down to the roof deck except for :
ice barrier membranes which are adhered to the roof deck. Where the existing roof cover is
wood shake, slate, clay, cement or asbestos cement tile - ✔✔Ice barrier membranes which
are adhered to the roof deck
Section 1511.3 Roof replacement-Exception:


A new metal panel roof covering can be installed over what type of existing roof covering ? -
✔✔Wood shakes
Section 1511.3.1 Roof recover-exception 3

Información del documento

Subido en
18 de abril de 2025
Número de páginas
41
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$14.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KenAli
2.6
(18)
Vendido
114
Seguidores
5
Artículos
23937
Última venta
4 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes