Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 7 páginas
Examen

Contractors License Exam Questions And Answers |Latest 2025 | Guaranteed Pass

Document preview thumbnail
Vista previa 2 fuera de 7 páginas

©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+ 1 Contractors License Exam Questions And Answers |Latest 2025 | Guaranteed Pass A flooring contractor cannot install what type of tile - Answerceramic tile the most common test for squareness of a room is - Answer3-4-5 triangle in job preparation the room temperature should be-------- 2 days before and 2-3 days after - Answerminimum 65 degrees and maximum 95 degrees when concrete floor is 18" above ground its called - Answerabove grade or suspended if floor is lower than surrounding ground it is called - Answerbelow grade concrete floor slab that is poured on the ground is called - Answeron grade a new concrete slab should be allowed to cure for at least----- before installing - Answer60- 120 days 3 methods to measure moisture - Answerthe crystal method, the glass method, the mats method ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+ 2 too much alkalinity on a concrete surface can prevent adhesives from bonding ph level must be at - Answer8.0or below concrete plank subfloors must be finished with - Answer2-3 inches of concrete topping with concrete plank subfloors what is not recomended - Answermastic underlayments priming is not a - Answerwaterproof process the purpose of priming is - Answerbetter adhesive bond when a concrete floor is painted you must - Answeralways remove paint before installing if installing carpet in top of resilient floor you must - Answerremove all grease, wax, glue never install felt underlying over old resilient floor because - Answerresulting surface will be too soft carpet, resilient floor, laminate floor can be installed over - Answerterrazzo or tile floors to prepare terrazzo floors you must - Answerremove all wax, sealers and roughened surface wood floors must be installed 18' above the ground for - Answeradequate ventilation types of woven carpets - Answervelvet, wilton, Axminster, chenille needle punch carpet is called -

Vista previa del contenido

©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+




Contractors License Exam Questions And
Answers |Latest 2025 | Guaranteed Pass




A flooring contractor cannot install what type of tile - Answer✔ceramic tile



the most common test for squareness of a room is - Answer✔3-4-5 triangle


in job preparation the room temperature should be-------- 2 days before and 2-3 days after -
Answer✔minimum 65 degrees and maximum 95 degrees



when concrete floor is 18" above ground its called - Answer✔above grade or suspended



if floor is lower than surrounding ground it is called - Answer✔below grade



concrete floor slab that is poured on the ground is called - Answer✔on grade



a new concrete slab should be allowed to cure for at least----- before installing - Answer✔60-
120 days



3 methods to measure moisture - Answer✔the crystal method, the glass method, the mats
method




1

, ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+


too much alkalinity on a concrete surface can prevent adhesives from bonding ph level must be
at - Answer✔8.0or below



concrete plank subfloors must be finished with - Answer✔2-3 inches of concrete topping



with concrete plank subfloors what is not recomended - Answer✔mastic underlayments



priming is not a - Answer✔waterproof process



the purpose of priming is - Answer✔better adhesive bond



when a concrete floor is painted you must - Answer✔always remove paint before installing



if installing carpet in top of resilient floor you must - Answer✔remove all grease, wax, glue



never install felt underlying over old resilient floor because - Answer✔resulting surface will be
too soft



carpet, resilient floor, laminate floor can be installed over - Answer✔terrazzo or tile floors



to prepare terrazzo floors you must - Answer✔remove all wax, sealers and roughened surface



wood floors must be installed 18' above the ground for - Answer✔adequate ventilation



types of woven carpets - Answer✔velvet, wilton, Axminster, chenille



needle punch carpet is called - Answer✔indoor-outdoor carpet

2

Información del documento

Subido en
16 de abril de 2025
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Brightstars
3.3
(41)
Vendido
269
Seguidores
7
Artículos
14962
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes