CSI CDT EXAM SCRIPT 2025/2026 QUESTIONS WITH
ANSWERS GRADED A+
✔✔The general contract clauses that establish payment responsibilities are found in:

a. General Conditions
b. Division 01 General Requirements
c. Payment bond
d. Addenda - ✔✔a. General Conditions

✔✔An example of a UniFormat Level 3 classification is:

a. G Site work
b. D20 Plumbing
c. B2070 Exterior Louvers and Vents
d. All of the above - ✔✔c. B2070 Exterior Louvers and Vents

✔✔The contractual relationship governed by the Conditions of the Contract is between:
a. Owner and contractor
b. Architect/engineer and contractor
c. Owner and Subcontractors
d. Owner, contractor, and architect/engineer - ✔✔a. Owner and contractor

✔✔A unit price contract or contract portion is used when:

a. Extent of work cannot be fully determined or where actual quantities cannot be
accurately calculated.
b. Extent of work is known, but the owner desires a break-out cost for portions of the
work.
c. It is anticipated that bidders will not examine soil-bearing reports prior to submitting
the bid.
d. Bidding quantities of equipment. - ✔✔a. Extent of work cannot be fully determined or
where actual quantities cannot be accurately calculated.

✔✔Instructions for Procurement:

a. Are used only on private projects
b. Frequently are standard industry forms
c. May include the geotechnical report as an attachment
d. Are binding upon the Contractor - ✔✔b. Frequently are standard industry forms

✔✔Which of the following would be included in Available Information?

a. Bid security requirements
b. Environmental Impact Statement

, c. Time of completion to construct the project
d. Description of the Work - ✔✔b. Environmental Impact Statement

✔✔Marked-up or corrected contract drawings that indicate changes incorporated in the
Work are:

a. Contract forms
b. Closeout submittals
c. Record drawings
d. As-builts
e. Not required for private work - ✔✔c. Record drawings

✔✔Submittal requirements for Facility Services Divisions 21 through 28 are specified in:

a. The first section in each respective division
b. Supplementary Conditions
c. Division 01 Section "Submittal Procedures"
d. Section 01 12 00 Summary of Multiple Contracts - ✔✔c. Division 01 Section
"Submittal Procedures"

✔✔Contractual clauses in the Conditions of the Contract:

a. Have priority over Division 01
b. Are superseded by Division 01
c. Are expanded upon by the provisions of Division 01
d. Are independent, and Division 01 provisions have no effect - ✔✔c. Are expanded
upon by the provisions of Division 01

✔✔When outside consultants are responsible for the production of major portions of the
project specifications:

a. One design team member should be responsible for overall specification coordination
b. Different document formats should be used to identify the work of the separate
consultants
c. The lead design professional should avoid the liability inherent in reviewing
consultants' work
d. Information should be collected and the project A/E assume responsibility for
preparing each section - ✔✔a. One design team member should be responsible for
overall specification coordination

✔✔In the specifications, the stated requirements address:
a. The owner's responsibilities
b. The contractor's responsibilities
c. The subcontractor's responsibilities
d. The architect's responsibilities

Información del documento

Subido en
15 de abril de 2025
Número de páginas
12
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BOARDWALK
3.5
(41)
Vendido
284
Seguidores
10
Artículos
33387
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes