ATC Tower
Phraseology for obtaining a release (Flight datas duty)...Write down time in block 11 on
flight data strip once release has been obtained. - answer EASTMAN DEPARTURE,
EASTMAN TOWER, REQUEST RELEASE, (AIR CRAFTS CALLSIGN), (RUNWAY)
Arrival separation for a CAT 1 aircraft (when full stopping) - answer When a CAT 1 is
landing behind a CAT 1 or 2 - 3,000 feet. CAT 3 has to be off runway before CAT 1 can
land.
Arrival separation for CAT 2 Aircraft (When full stopping) - answer When CAT 2 is
landing Behind a CAT 1 or 2 - 4,500 feet. CAT 3 has to be off the runway before CAT 2
can land
Arrival Separation for When a CAT 1 or CAT2 is preforming a TG, - answer Same as
when full stopping.
Arrival separation for when a CAT 3 aircraft is preforming a TG - answer6,000 feet
Pharesology for Aircraft landing and needs a wake turbulence advisory. -
answer(callsign) CAUTION WAKE TURBULENCE (RUNWAY) CLEARED TO LAND
Phraseology when you can not issue landing clearance - answer(callsign) (runway)
CONTINUE
Ways to ensure better separation on tower traffic pattern in case - answer(Best ways)
Extend downwind, Make left/right 360.......... (Other ways) Make short approach, make
left/right 270
Phraseology for takeoff clearance - answer(callsign) EASTMAN TOWER (runway)
Cleared for takeoff.
When there are two planes on your frequency looking to depart, from ALPHA and
Charlie. - answerFirst tell guy at the intersection to hold for traffic.....then(Callsign)
(runway) FULL LENGTH CLEARED FOR TAKEOFF
DO not issue a small Aircraft to line up and wait on the same runway behind a departing
______________ aircraft. - answerHeavy Jet
an Aircraft departing behind a heavy has to wait _______ minutes when departing. -
answer2,...but 3 at the intersection.
Phraseology for obtaining a release (Flight datas duty)...Write down time in block 11 on
flight data strip once release has been obtained. - answer EASTMAN DEPARTURE,
EASTMAN TOWER, REQUEST RELEASE, (AIR CRAFTS CALLSIGN), (RUNWAY)
Arrival separation for a CAT 1 aircraft (when full stopping) - answer When a CAT 1 is
landing behind a CAT 1 or 2 - 3,000 feet. CAT 3 has to be off runway before CAT 1 can
land.
Arrival separation for CAT 2 Aircraft (When full stopping) - answer When CAT 2 is
landing Behind a CAT 1 or 2 - 4,500 feet. CAT 3 has to be off the runway before CAT 2
can land
Arrival Separation for When a CAT 1 or CAT2 is preforming a TG, - answer Same as
when full stopping.
Arrival separation for when a CAT 3 aircraft is preforming a TG - answer6,000 feet
Pharesology for Aircraft landing and needs a wake turbulence advisory. -
answer(callsign) CAUTION WAKE TURBULENCE (RUNWAY) CLEARED TO LAND
Phraseology when you can not issue landing clearance - answer(callsign) (runway)
CONTINUE
Ways to ensure better separation on tower traffic pattern in case - answer(Best ways)
Extend downwind, Make left/right 360.......... (Other ways) Make short approach, make
left/right 270
Phraseology for takeoff clearance - answer(callsign) EASTMAN TOWER (runway)
Cleared for takeoff.
When there are two planes on your frequency looking to depart, from ALPHA and
Charlie. - answerFirst tell guy at the intersection to hold for traffic.....then(Callsign)
(runway) FULL LENGTH CLEARED FOR TAKEOFF
DO not issue a small Aircraft to line up and wait on the same runway behind a departing
______________ aircraft. - answerHeavy Jet
an Aircraft departing behind a heavy has to wait _______ minutes when departing. -
answer2,...but 3 at the intersection.