1|Page




CLC-222 CONTRACTING EXAM



Who has the official responsibility for performing market research? - ANS
✓COR/functional office


Items to consider during the development of the IGE include: (select all that apply) -
ANS ✓1. An estimate that agrees with document market research
2. an unbiased realistic cost estimate for supplies or services that will be procured
under the contract


The existing contract, including all options, is about to end. The customer likes the
work of the incumbent contractor and has expressed a desire to have the new
contract be awarded to that incumbent contractor. Which one of the following
statements is true? - ANS ✓The COR can assist an acquisition planning and writing
the evaluation criteria to ensure the best contractor is selected for the new contract


Some methods of contracting require more time than others. Which of the following
is not a streamlined method of acquisition? - ANS ✓Buys against GSA federal supply
schedule


The Contracting Officer's Representative must read and understand the contract,
including any attachments and modifications to the contract. - ANS ✓True


A separate Contract Line Item Number (CLIN) should be used for each item on a
contract. - ANS ✓True



A bilateral modification is used to_____________. - ANS ✓All of these are correct

, 2|Page



When changes are made to a contract, the government must determine if the
change is within scope. In plain English that means the work falls under the basic
intent of the original contract. - ANS ✓True


The COR should work with the Contracting Officer if the COR identifies a need to
change the current contract. - ANS ✓True


The COR may be asked to review the cost proposal and the proposed Basis of
Estimate (BOE) and to assist the KO in determining the reasonableness of the
proposed amounts. - ANS ✓True



Common causes of a constructive change include: - ANS ✓All these answers are
correct


When there is a difference of opinion between the COR and the contractor on a
specification within the contract, the COR should direct the contractor to perform in
accordance with the COR's interpretation. - ANS ✓False


After award of the contract, the post-award conference is a good place to ensure
that the government and the contractor have a common understanding of the
contractual requirements. - ANS ✓True



Past performance assessments include input from the __________. - ANS ✓All the
answers are correct


The inspection clause for ____________contracts allows for the contractor to charge
the cost of rework to the government. - ANS ✓Cost Reimbursement

Escuela, estudio y materia

Institución
CLC-222 CONTRACTING
Grado
CLC-222 CONTRACTING

Información del documento

Subido en
11 de abril de 2025
Número de páginas
12
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$14.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Solutionproffesor Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
58
Miembro desde
3 año
Número de seguidores
13
Documentos
2036
Última venta
1 semana hace

4.7

12 reseñas

5
11
4
0
3
0
2
0
1
1

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes