The _________ consists of daily checks of the work to assure continuing compliance with
contract requirements - (answers)Follow-up Phase
Design-Build contracts require - (answers)The QC Manager to be in place and take an active role
in the review and coordination of the design.
Which of the following is included in all three phases of the Three Phases of Control? -
(answers)Safety
The purpose of Construction Quality Management is to - (answers)Achieve the quality
established by properly developed requirements through the combined responsibility, but
separate, efforts of contractors and government personnel
Testing is extremely important in construction quality management and is performed by -
(answers)Both the contractor and the government
The primary purpose of the Three-Phase Control System is to - (answers)Require the contractor
to plan, schedule, and perform quality management actions to assure work meets all specified
quality standards
Quality Assurance Personnel have the responsibility to - (answers)Require the contractor to
maintain the quality specified in the plans and specifications
The _________________ is the appropriate time to assure that all materials and/or equipment
have been tested, submitted, and approved - (answers)Preparatory Phase
, The Preconstruction Conference and Coordination and Mutual Understanding Meeting Are -
(answers)Conducted prior to the commencement of any physical construction work
Contractor testing procedures: - (answers)Are specified in the technical specs, outlined in the
QCP, and addressed at Coordination and Mutual Understanding Meeting
The Quality Control Plan contains - (answers)Identification of individual quality quality control
personnel, including name, qualifications, assigned duties, responsibilities and authorities.
Tests that are unannounced, randomly performed, and repeat quality control tests are -
(answers)Quality assurance tests
The contractor is required to conduct a Preparatory Phase Meeting before they begin any
definable feature of work except when - (answers)There are no exceptions to the rule
During the punch-out inspection of a project: - (answers)Quality Control personnel prepare and
punch-list and make corrections
The Quality Control Report should include - (answers)All of the above
In a design build contract, if the contractor has a question about the design, what is the process to
get an answer? - (answers)Contractor submits a design verification request to the contractor's
design team
Submittals are - (answers)Necessary to demonstrate that the proposed materials, etc. are in
compliance with the contract.
The success or failure of all contractors is based upon - (answers)The ability to control costs,
finance work, estimate jobs, schedule the work and maintain effective quality control
QUESTIONS WITH 100% RATED CORRECT ANSWERS | GRADED A+| 2025 LATEST
UPDATED
The _________ consists of daily checks of the work to assure continuing compliance with
contract requirements - (answers)Follow-up Phase
Design-Build contracts require - (answers)The QC Manager to be in place and take an active role
in the review and coordination of the design.
Which of the following is included in all three phases of the Three Phases of Control? -
(answers)Safety
The purpose of Construction Quality Management is to - (answers)Achieve the quality
established by properly developed requirements through the combined responsibility, but
separate, efforts of contractors and government personnel
Testing is extremely important in construction quality management and is performed by -
(answers)Both the contractor and the government
The primary purpose of the Three-Phase Control System is to - (answers)Require the contractor
to plan, schedule, and perform quality management actions to assure work meets all specified
quality standards
Quality Assurance Personnel have the responsibility to - (answers)Require the contractor to
maintain the quality specified in the plans and specifications
The _________________ is the appropriate time to assure that all materials and/or equipment
have been tested, submitted, and approved - (answers)Preparatory Phase
, The Preconstruction Conference and Coordination and Mutual Understanding Meeting Are -
(answers)Conducted prior to the commencement of any physical construction work
Contractor testing procedures: - (answers)Are specified in the technical specs, outlined in the
QCP, and addressed at Coordination and Mutual Understanding Meeting
The Quality Control Plan contains - (answers)Identification of individual quality quality control
personnel, including name, qualifications, assigned duties, responsibilities and authorities.
Tests that are unannounced, randomly performed, and repeat quality control tests are -
(answers)Quality assurance tests
The contractor is required to conduct a Preparatory Phase Meeting before they begin any
definable feature of work except when - (answers)There are no exceptions to the rule
During the punch-out inspection of a project: - (answers)Quality Control personnel prepare and
punch-list and make corrections
The Quality Control Report should include - (answers)All of the above
In a design build contract, if the contractor has a question about the design, what is the process to
get an answer? - (answers)Contractor submits a design verification request to the contractor's
design team
Submittals are - (answers)Necessary to demonstrate that the proposed materials, etc. are in
compliance with the contract.
The success or failure of all contractors is based upon - (answers)The ability to control costs,
finance work, estimate jobs, schedule the work and maintain effective quality control