Agile Management COMPREHENSIVE PRACTICE TEST

Vista previa del contenido

Agile Management COMPREHENSIVE
PRACTICE TEST

Which of the following best fits an empirical process? - correct Answer-Creating a
painting

A philosophy that emphasizes awareness, listening, and relationship building as the
path to creating value is called - correct Answer-Servant leadership

A _________________ is a product-centric meeting where any interested or impacted
stakeholder can come and see what was just finished. - correct Answer-Review meeting

The need for an iterative development framework and an integrated, cross-functional
team of experts is driven by the___________________that fill the environment. -
correct Answer-Complexity and uncertainty

Agile development approaches continuously reprioritize requirements in response to
changing stakeholder needs or environmental variables. Doing so helps - correct
Answer-Maximize the value

The people responsible for getting the sprint work to done are part of - correct Answer-
The development team

The team creates a graphical expression of the solution that includes whatever images
and narrative content is necessary to convey what the customer expects. This is called
the - correct Answer-Product vision box

Agile teams must have interpersonal and technical skills to deliver outcomes with high
business value, otherwise - correct Answer-Communication breakdowns cause the
project to fail

What is the maximum length of a sprint? - correct Answer-All of the above

What factors make up a potentially shippable increment (PSI)? - correct Answer-Is in a
state of high quality meaning that increment could be shipped

When does the next sprint begin? - correct Answer-Immediately after the conclusion of
the previous sprint

The product backlog contains - correct Answer-All work that needs to be completed by
the delivery team to ensure success and delivery of value

, The Product Owner must have the ________________ needed and are able to
represent the _____________ and _____________ all questions related to what should
be delivered. They also control the _________ of the product and are responsible for
the ________. - correct Answer-Authority; business; answer; "What;" ROI

It's okay if your Product Owner is absent most of the time, as long as they have the
backlog items ready. - correct Answer-False

What are two ways you can determine velocity? - correct Answer-Using yesterday's
weather (the story points completed in the last sprint)

A backlog refinement activity allows the Product Owner and the team to
_____________________, _________________, and __________________. (Choose
the three phrases that fit this sentence.) - correct Answer--Break down user stories into
smaller user stories
-Size and resize user stories
-Add acceptance criteria on user stories

Agile teams must have interpersonal and technical skills to deliver outcomes with high
business value, otherwise - correct Answer-Communication breakdowns cause the
project to fail

Which one of these is not true? - correct Answer-Kaizen was created by the Japanese
during World War II

Summing up the quantity of work remaining for each uncompleted backlog item is called
- correct Answer-A burn-down chart

Continuous integration does not offer - correct Answer-A status of progress

Which of the follow are responsibilities of a project manager? - correct Answer--Risk
-Schedule
-Cost
-Stakeholder Management

A traditional project using traditional methods is probably using which methodology? -
correct Answer-Waterfall

In the Agile lexicon, the initial scope, schedule, and cost estimates are done with the
understanding that they reflect a high-level, low-granularity assessment of the effort
necessary to complete the deliverables. This level of planning is called a - correct
Answer-Roadmap

Información del documento

Subido en
25 de marzo de 2025
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
4
Seguidores
2
Artículos
855
Última venta
7 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes