PJM Generation Dispatch Exam with
Complete Solutions
_____________ is comprised of all those resources on line following economic dispatch and
able to ramp up from their current output in response to a Synchronized Reserve Event, or
Demand Resources capable of reducing load, within 10 minutes.


A) Tier 1 Synchronized Reserve
B) Secondary Reserve
C) Operating Reserve

D) Regulation Reserve ✔️✔️A) Tier 1 Synchronized Reserve


Black Start units must be able to start without outside power and close into a dead bus within
________?


A) 1 hour
B) 2 hours
C) 3 hours

D) 4 hours ✔️✔️C) 3 hours


Black Start units must be able to run at max output for ___________ or else notify the PJM.


A) 12 hours
B) 24 hours
C) 10 hours

D) 30 hours ✔️✔️C) 10 hours

,Generation units with a hot start time of _______ hours or less are included in the Minimum
Critical Black Start requirements?


A) 1
B) 2
C) 3

D) 4 ✔️✔️D) 4


How many black start units will be allocated to each transmission zone?


A) 1
B) 2
C) 3

D) 4 ✔️✔️B) 2


In which level of Crosszonal coordination would two or more TO zones have an aggregated
restoration plan?


A) 1
B) 2
C) 3



(Awkwardly worded question directly from PJM Training Material) ✔️✔️C) 3


Cold weather alerts are issued when the forecasted weather conditions ________
(Choose 3)


A) for the control zone drop below 10 deg. F

,B) anticipated increased wind
C) for any site could freeze critical systems
D) expected spot market curtailments during load pick-up period

E) gas deliveries may be delayed due to road conditions ✔️✔️A) for the control zone drop below
10 deg. F
B) anticipated increased wind
D) expected spot market curtailments during load pick-up period


Real time transmission constraints or contingencies may be alleviated with generators
operating


A. below 60 Hz.
B. on a new price curve.
C. on a new cost curve.

D. off cost (out of merit). ✔️✔️D. off cost (out of merit).


PJM Balancing Operations Manual M-12; Attachment B


Which of the following statements is correct concerning PJM assuming frequency control of the
restoration process?


A) PJM assumes control once an external transmission tie has been established.
B) Once an Area Control Error can be calculated, PJM will assume control.
C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO
D) Whenever the Transmission Owners within the RTO agree to let PJM control the process.
✔️✔️C) Whenever it becomes too much of a burden for any one Transmission Owner within the
RTO


During black start restoration, priority access to cranking power should be given to:

, A) Hot units that can return to service immediately.
B) Combustion turbines in areas where the initial disturbance occurred
C)Units with black start capability

D) Hydro Units ✔️✔️A) Hot units that can return to service immediately.


During a restoration, if you are presented with the opportunity to re-connect with the Eastern
Interconnection, you should:


A)Not pursue this opportunity because you may cause the Eastern Interconnection to become
unstable.
B) Pursue this opportunity only when you have adequate Dynamic Reserves on your system
C) Pursue this opportunity as quickly as possible

D) Pursue this opportunity only if you need cranking power for your generating unity ✔️✔️C)
Pursue this opportunity as quickly as possible


Complete (Total System) Blackouts are characterized by which of the following?


1 - Most common type of blackout
2 - May require coordinating multiple islands
3 - Likely to result in Transmission overloads or other issues
4 - Affects a very large geographical area, and many customers
5 - Most commonly caused by human or switching errors


A) 1 & 3
B) 2 & 4
C) 3 & 5

D) 1 ✔️✔️B) 2 & 4

Información del documento

Subido en
22 de marzo de 2025
Número de páginas
66
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KateJones
4.8
(12)
Vendido
32
Seguidores
0
Artículos
5716
Última venta
1 mes hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes