• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 56 páginas
Examen

Devrim's CDFM Module 4 Flashset questions with verified answers

Document preview thumbnail
Vista previa 4 fuera de 56 páginas

- a Capstone document that addresses current and future threats to a defined U.S. warfighting capability - a system-specific threat assessment for programs subject to Defense Acquisition Board review Ans What form can DIA-validated threat assessments for Major Defense Acquisition Programs take? - Acquisition of Services Planning (requirements development, acquisition planning, solicitation and contract award, risk management, contract tracking and oversight, performance evaluation) - Review and Approval - Peer Reviews - Data Collection - Clinger-Cohen Act Compliance Ans While the acquisition of services does not follow the five phases of the material systems life cycle, what requirements must be considered and appropriately addressed in regard to services acquisition? - Decision Analysis - Technical Planning - Technical Assessment - Requirements Management - Risk Management - Configuration Management

Vista previa del contenido

Devrim's CDFM Module 4 Flashset questions with
verified answers
- a Capstone document that addresses current and future threats to a defined
U.S. warfighting capability
- a system-specific threat assessment for programs subject to Defense Acquisition
Board review Ans✓✓✓ What form can DIA-validated threat assessments for
Major Defense Acquisition Programs take?


- Acquisition of Services Planning (requirements development, acquisition
planning, solicitation and contract award, risk management, contract tracking and
oversight, performance evaluation)
- Review and Approval
- Peer Reviews
- Data Collection
- Clinger-Cohen Act Compliance Ans✓✓✓ While the acquisition of services does
not follow the five phases of the material systems life cycle, what requirements
must be considered and appropriately addressed in regard to services
acquisition?


- Decision Analysis
- Technical Planning
- Technical Assessment
- Requirements Management
- Risk Management
- Configuration Management
- Data Management

,- Interface Management Ans✓✓✓ What makes up Technical Management
Processes?


- Defense Acquisition Board
- Information Technology Acquisition Board
- Joint Requirements Oversight Council
- DOD Component boards (specific to each service or DOD Component Ans✓✓✓
What are the principal Executive Level Boards and Councils that review
acquisition programs throughout the acquisition life cycle?


- Developmental Test and Evaluation (DT&E)
- Operational Test and Evaluation (OT&E)
- Live Fire Test and Evaluation (LFT&E) Ans✓✓✓ What are the three types of tests
& evaluations performed by the DOD?


- disclosure of both classified military and unclassified technical data
- control of foreign visitors
- export control Ans✓✓✓ RDT&E conducted within the DOD, as well as by DOD
contractors, is covered by what?


- Foreign participation in system development is possible
- An allied system will be used
- The system to be developed is a candidate for foreign sales or direct commercial
sales
- The system will be used in multinational operations

,- The program will involve cooperative R&D with allied or friendly foreign
countries Ans✓✓✓ A Technology Assessment/Control Plan (TA/CP) and a
Delegation Disclosure Authority Letter (DDL) should be prepared as annexes to
the PPP when a determination is made that what following conditions exist?


- relates the scope of the work to its associated budgets and schedule
- measures the work progress in objective terms
- states the value of the work completed in dollars, or other measurable units
Ans✓✓✓ Earned Value Management is a tool that does what?


- Requirements Development
- Logical Analysis
- Design Solution
- Implementation
- Integration
- Verification
- Validation
- Transition Ans✓✓✓ What makes up Technical Processes?


- System and program description
- All program and support points of contact
- a prioritized list of program CPI
- Multidiscipline Counterintelligence (MDCI) threat assessment to CPI
- Vulnerabilities of CPI
- All Research and Technology Protection (RTP) countermeasures and Militarily
Critical Technology List (MCTL) citations for applicable DS&TI or CPI

, - All RTP associated costs, by Fiscal Year, to include PPP development and
execution
- CI Support Plan (CISP)
- Current Security Classification Guide (SCG)
- Foreign disclosure, direct commercial sales, co-production, import, export
license or other export authorization requirements, and/or Technology
Assessment/Control Plan (TA/CP)
- Delegation of Disclosure Authority Letter, if appropriate Ans✓✓✓ What do
Program Protection Plans (PPPs) normally include?


- the program manager determines the existence of CPI
- If a program contains CPI, program protection planning is required. Program
manager is responsible for developing and implementing a Program Protection
Plan (PPP)
- The PPP will be developed, as required, beginning in the Technology
Development Phase, and will be available to the Milestone Decision Authority at
Milestone B and all subsequent milestones
- the program proceeds through the milestones and phases of the acquisition
process after the protection planning foundation is laid. The program follows an
event-based schedule that implements the protection strategy and completes the
actions outlined in the PPP. Ans✓✓✓ What are the key steps with regard to the
Acquisition Protection Stategy?


"tools" to provide learning experiences such as computer based interactive
courseware, simulators, and actual equipment (including embedded training
capabilities on actual equipment), job performance aids, and Interactive
Electronic Technical Manuals. Ans✓✓✓ The "training/instructional system"
includes what?

Información del documento

Subido en
21 de marzo de 2025
Número de páginas
56
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
cracker
3.8
(402)
Vendido
2185
Seguidores
1346
Artículos
50179
Última venta
6 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes