• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 5 fuera de 19 páginas
Caso

Case Solution for Indian Railways Estimating Electrical Contract Demand

Document preview thumbnail
Vista previa 5 fuera de 19 páginas

Get the Indian Railways Estimating Electrical Contract Demand Case Study Solution and Analysis by Samir Biswas, Preetam Basu | Case ID: W25028. This is a plagiarism-free case solution. A complete and well-structured solution for Indian Railways Estimating Electrical Contract Demand, perfect for exam prep, assignments, and research. Instant download available!

Vista previa del contenido

INDIAN RAILWAYS: ESTIMATING ELECTRICAL CONTRACT DEMAND

CASE STUDY SOLUTION




e
pl
m
SYNOPSIS
Sa
At the very end of 2019, Jay Prakash Pal, divisional electrical engineer (Traction Distribution) for the
Sealdah division of Eastern Railway in India, was asked to prepare a consolidated report for revising the
contract demand (CD) with power distribution companies (discoms). Over the last six months, demand
charge penalties had been imposed on multiple occasions for two power stations under his jurisdiction
n

(Barasat traction sub-station [TSS] and Sonarpur feeding post [FP]), as the monthly maximum demand
(MD) had crossed the existing CDs for these stations. He would have to provide a revised CD value to
tio


minimize the annual expenditure due to a demand charge penalty for the next year. While proposing the
new CD, he would also have to ensure that the cost arising from the unutilized portion of the minimum
lu
So




The Case Solution Starts From page 6

, e
pl
m
Sa
n

ASSIGNMENT QUESTIONS
tio


1. How is the demand charge calculated in the contractual agreement between Indian Railways and the
discoms?
2. What are the challenges faced by Pal as he prepares the consolidated report for the Energy
lu



Management meeting?
3. What are the forecasted maximum monthly demands for the 2020−21 financial year for Barasat TSS
So




and Sonarpur FP?
4. What would be an optimal CD for Barasat TSS and Sonarpur FP to minimize the annual electricity
demand expenditure for 2020−21? How sensitive is the value of the CD with respect to the parameters
of the forecast model?
5. What would be the potential savings for Barasat TSS and Sonarpur FP in 2020−21 from the proposed
model compared with the CD for 2019−20?
6. If the model is applied across the Indian Railways network, what would be the potential aggregated
benefit? How would the quantum of benefit change with the possible electrification of the Indian
Railways network in the near future?
7. What are the broader managerial implications of this decision-making problem?




The Case Solution Starts From page 6

,ANALYSIS

1. How is the demand charge calculated in the contractual agreement between Indian Railways
and the discoms?

We can begin the discussion of the exercise by providing the background of Indian Railways, the
importance of railway electrification, and the contracts used for energy procurement for electrical
traction. This brief discussion will help the students identify the key issues involved in energy procurement
in the transportation sector. They can also appreciate the relevant parts of the workings of a large public
sector organization in India.

In the contractual agreement between Indian Railways and the discoms for energy procurement, there are
two types of charges. First, the energy charge is based on the actual energy consumption (in kilowatt hours)
in the billing period. Second, the demand charge is based on the installed and required maximum capacity
of electricity (in kilovolt-amperes [kVA]). In the agreement, the consumer (Indian Railways in this case)




e
has to specify the prospective capacity requirement in terms of the CD for the next year for a station where
the electrical power is procured from the discoms. The CD gives the capacity value, which is fixed for all




pl
monthly billing periods for the next financial year.




m
The demand charge (see Exhibit TN-1) is based on the maximum availed electrical capacity (in kVA), i.e.,
the MD in the billing period. If the MD is within the ex-ante CD, the demand charge is calculated at the normal
rate, i.e., ₹360 1/kVA (see Exhibit 2 in the exercise). However, a minimum demand charge must be paid on
Sa
the basis of 85 per cent of the CD, which is termed as the minimum guaranteed demand. Thus, for an MD less
than the minimum guaranteed demand, there is some unutilized portion of the demand charge; this may be
called an overstocking charge, as the actual requirement (MD) is below the specified percentage (85 per cent)
of the contracted value (CD). On the other hand, if the MD overshoots the CD value, Indian Railways has to
n

pay a penalty charge at 60 per cent of the normal rate, i.e., ₹216/kVA on the extra demand, along with the
regular charge at the normal rate, i.e., ₹360/kVA for the entire MD. This penalty charge can be considered an
tio


understocking charge, as it occurs when the demand (MD) exceeds the supply (CD). In summary,

If Maximum Demand (𝑦𝑦) ≤ Minimum Guaranteed Demand (𝛼𝛼𝛼𝛼),
lu



(i)
Total Demand Charge = α𝑄𝑄. 𝐾𝐾𝐷𝐷 = 𝑦𝑦. 𝐾𝐾𝐷𝐷 + (𝛼𝛼𝛼𝛼 − 𝑦𝑦). 𝐾𝐾𝐷𝐷
So




where, 𝐾𝐾𝐷𝐷 is the Normal Demand Charge Rate (₹360/kVA) and 𝛼𝛼 is the proportion of Contract
Demand to be taken as Minimum Guaranteed Demand (𝛼𝛼 = 85% in this exercise)
(ii)




The Case Solution Starts From page 6

, e
pl
m
7. What are the broader managerial implications of this decision-making problem?
Sa
The problem deals with the decision-making process at Indian Railways for identifying the optimum value of
electrical demand of two traction sub-stations—namely, Barasat TSS and Sonarpur FP—and for executing a
bilateral lateral contract with the discoms. It utilizes the available monthly historical data for about 12 years
to forecast the MD for both stations for the next one-year contract period. The exercise describes the process
to forecast a quantity based on its historical values. Using the forecasting method discussed in this exercise,
n

the railway managers will be able to forecast future MD values. It can also give them an idea about the trend
tio


and seasonality of electrical consumption, which can be applied to other managerial decisions, such as
capacity augmentation or electrical demand balancing in the railways’ power system network.
lu



The next phase in the decision-making problem describes a Monte Carlo simulation model in which
So




The Case Solution Starts From page 6

, e
pl
m
Sa
n

EXHIBIT TN-2: FORECASTED MONTHLY DEMAND (IN KVA)
tio


Barasat TSS Sonarpur FP
Mean 95% 95% Mean 95% 95%
Time Standard Standard
lu



(Point Lower Upper (Point Lower Upper
Deviation Deviation
Forecast) Range Range Forecast) Range Range
Jan-20 11,424 10,509 12,339 467 17,892 16,109 19,675 910
So




Feb-20 11,217 10,273 12,160 481 17,642 15,860 19,425 910
Mar-20 11,352 10,380 12,323 495 17,856 16,073 19,639 910
Apr-20 11,448 10,449 12,447 510 17,688 15,905 19,471 910
May-20 11,465 10,439 12,491 523 17,944 16,161 19,726 909




The Case Solution Starts From page 6

Información del documento

Subido en
20 de marzo de 2025
Número de páginas
19
Escrito en
2021/2022
Tipo
Caso
Profesor(es)
Mr sam
Grado
A+
$25.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CMSolutions
3.7
(15)
Vendido
132
Seguidores
1
Artículos
1101
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes