1. Who is responsible for managing the project’s budget and resources?

A. Project sponsor

B. Project manager

C. Project team members

D. Project stakeholders

Answer: B) Project manager

Rationale: The project manager is responsible for planning, monitoring, and

controlling the project’s budget and resources.




2. A project manager identifies a risk and decides to avoid it by changing the project

scope. What risk response strategy is this?

A. Mitigation

B. Avoidance

C. Acceptance

D. Transfer

Answer: B) Avoidance

,Rationale: Avoidance involves changing the project plan to eliminate the risk or its

impact, as seen in the example where the project scope is changed to avoid the risk.




3. Which project management method focuses on defining clear phases and a linear

path from start to finish?

A. Agile

B. Lean

C. Waterfall

D. Scrum

Answer: C) Waterfall

Rationale: Waterfall is a traditional project management methodology where tasks and

phases are completed sequentially, with a clear path from start to finish.




4. Which of the following is an example of a quantitative risk analysis technique?

A. SWOT analysis

B. Monte Carlo simulation

C. Brainstorming

D. Delphi technique

Answer: B) Monte Carlo simulation

,Rationale: Monte Carlo simulation is a quantitative risk analysis technique used to

predict the probability of different outcomes in a project by running simulations based

on input variables.




5. What is "quality control" in project management?

A. The process of monitoring and controlling project costs

B. Ensuring that the project scope aligns with stakeholder requirements

C. The process of monitoring and measuring project results against quality standards

D. Developing quality standards for the project

Answer: C) The process of monitoring and measuring project results against quality

standards

Rationale: Quality control involves inspecting and measuring project deliverables to

ensure they meet predefined quality standards.




6. A project manager is focusing on delivering a project within scope, time, and cost

constraints. This is an example of managing which of the following?

A. Project procurement

B. Project triple constraint

C. Project stakeholders

, D. Project communication

Answer: B) Project triple constraint

Rationale: The project triple constraint refers to the balance of scope, time, and cost,

which must be managed to deliver a successful project.




7. A project manager has identified a potential risk that could impact the project. What

is the next step the manager should take?

A. Avoid the risk

B. Mitigate the risk

C. Perform qualitative risk analysis

D. Ignore the risk

Answer: C) Perform qualitative risk analysis

Rationale: After identifying a risk, the next step is typically to assess its likelihood

and impact through qualitative risk analysis, which helps prioritize the risk.




8. Which of the following is the best approach for managing project changes?

A. Allow changes without any process

B. Implement a formal change control process

C. Ignore minor changes to the project

Información del documento

Subido en
17 de marzo de 2025
Número de páginas
60
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
douglasmugwe82
5.0
(1)
Vendido
2
Seguidores
0
Artículos
4215
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes