Vapor Recovery ICC Practice Test 1: Questions With
Easy-to-Follow Solutions
Phase I equipment is related all of the following except? Correct Answer -
Dispenser mounted vapor recovery equipment
According to EO VR-201-A, the only authorized hose configuration is?
Correct Answer - Lazy J- EO VR-201
The most ARB approved Phase II vapor recovery is? Correct Answer - EVR
When a certified Healy Technician is replacing the VP 100 during operational
hours, he should eliminate potential problems by, except? Correct Answer -
review service with gas station operator
The following component is not part of the Healy Phase II vapor recovery
system? Correct Answer - Healy Model 900 Vapor motor
The max dispensing floe rate of a Healy 900 series EVR nozzle is ? Correct
Answer - 10 GPM
According to VR-201-A, a __________________ should be installed on the Healy
system if the flow rate us above 10 GMP? Correct Answer - Flow limiter
The quarterly inspection and Testing of a Healy Phase II EVR system should
include the following except? Correct Answer - Conduct a pressure decay
test by a Healy Certified Technician - EO VR_-201-A
The first sign of oxygen depletion is? Correct Answer - Accelerated
breathing and heartbeat
According to the PEI 500, a method of removing a portion of a facility from
service are, except? Correct Answer - Noting in defective equipment log
What procedure checks the integrity of the vapor check valve in the nozzle?
Correct Answer - Nozzle bag test
, Which of the following conditions is a Healy certified technician NOT required
to repair? Correct Answer - Reconnection of a breakaway after a drive off
During the annual inspection and testing of the vapor recovery system; the
first three steps are to:
i. Conduct static pressure performance of the Healy Clean air separator
ii. Conduct pressure decay test
iii. Conduct dispenser vapor line tightness test
iiii. ...?
What is the Fourth step? Correct Answer - Conduct V/L test on all nozzles
What procedure is required after a nozzle spout change? Correct Answer -
Nozzle automatic shutoff test
A vapor recovery system generally uses what unit of measurement? Correct
Answer - Inches of water
What is the lower limit of acceptable V/L for a nozzle? Correct Answer
- .95
What organization does a technician have to be certified with to perform
maintenance on vapor recovery systems? Correct Answer - ICC- Title 23
2715
The clean air separator belongs to which system? Correct Answer - Healy
Phase II EVR
All of the following items should be on hand to react to a spill except?
Correct Answer - Class A fire extinguisher
Which is not a component of a Healy phase II vapor recovery system?
Correct Answer - Universal 37
Which of the following is not part of the hanging hardware? Correct Answer
- Husky model 4885
What is mounted on the top of the manifold vent mast? Correct Answer -
Pressure/vacuum vent cap
Easy-to-Follow Solutions
Phase I equipment is related all of the following except? Correct Answer -
Dispenser mounted vapor recovery equipment
According to EO VR-201-A, the only authorized hose configuration is?
Correct Answer - Lazy J- EO VR-201
The most ARB approved Phase II vapor recovery is? Correct Answer - EVR
When a certified Healy Technician is replacing the VP 100 during operational
hours, he should eliminate potential problems by, except? Correct Answer -
review service with gas station operator
The following component is not part of the Healy Phase II vapor recovery
system? Correct Answer - Healy Model 900 Vapor motor
The max dispensing floe rate of a Healy 900 series EVR nozzle is ? Correct
Answer - 10 GPM
According to VR-201-A, a __________________ should be installed on the Healy
system if the flow rate us above 10 GMP? Correct Answer - Flow limiter
The quarterly inspection and Testing of a Healy Phase II EVR system should
include the following except? Correct Answer - Conduct a pressure decay
test by a Healy Certified Technician - EO VR_-201-A
The first sign of oxygen depletion is? Correct Answer - Accelerated
breathing and heartbeat
According to the PEI 500, a method of removing a portion of a facility from
service are, except? Correct Answer - Noting in defective equipment log
What procedure checks the integrity of the vapor check valve in the nozzle?
Correct Answer - Nozzle bag test
, Which of the following conditions is a Healy certified technician NOT required
to repair? Correct Answer - Reconnection of a breakaway after a drive off
During the annual inspection and testing of the vapor recovery system; the
first three steps are to:
i. Conduct static pressure performance of the Healy Clean air separator
ii. Conduct pressure decay test
iii. Conduct dispenser vapor line tightness test
iiii. ...?
What is the Fourth step? Correct Answer - Conduct V/L test on all nozzles
What procedure is required after a nozzle spout change? Correct Answer -
Nozzle automatic shutoff test
A vapor recovery system generally uses what unit of measurement? Correct
Answer - Inches of water
What is the lower limit of acceptable V/L for a nozzle? Correct Answer
- .95
What organization does a technician have to be certified with to perform
maintenance on vapor recovery systems? Correct Answer - ICC- Title 23
2715
The clean air separator belongs to which system? Correct Answer - Healy
Phase II EVR
All of the following items should be on hand to react to a spill except?
Correct Answer - Class A fire extinguisher
Which is not a component of a Healy phase II vapor recovery system?
Correct Answer - Universal 37
Which of the following is not part of the hanging hardware? Correct Answer
- Husky model 4885
What is mounted on the top of the manifold vent mast? Correct Answer -
Pressure/vacuum vent cap