LOUISIANA RESIDENTIAL CONTRACTORS LICENSE QUESTIONS & ANSWERS(RATED A+)

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

What is the minimum compressive strength in psi for a concrete basement slab with negligible weathering potential? - ANSWER2,500 PSI An accessory structure is a structure not greater than _______ SF - ANSWER3,000 SF What is the R Value insulation requirement for a residential floor climate zone 3? - ANSWER19 For a "Means of Egress Door", what is the minimum width of each door opening in inches? - ANSWER32'' Exterior wood framing walls shall be a minimum of _____ grade wood. - ANSWER3 Which of the following is not considered work exempt from a permit? Swings/Playground equipment Sidewalks Fences less than 6ft interior painting - ANSWERFences less than 6 ft A permit becomes invalid if the work authorized by the permit does not begin in ____ days. - ANSWER180 days True or False the building Permit should be kept onsite until work is complete? - ANSWERTrue When shall a final inspection be conducted? - ANSWERAfter permitted work is complete. Who appoints the building official from the department of building safety? - ANSWERChief Appointing Authority of the Jurisdiction When there is a conflict and different sections of the IBC specify different materials you must? - ANSWERUse the most restrictive guidence Live loads for floors and roofs must be posted by the owner when they exceed _______PSF - ANSWER50 PSF What is Required in a certificate of occupancy? - ANSWERName and Address of Own

Vista previa del contenido

LOUISIANA RESIDENTIAL
CONTRACTORS LICENSE QUESTIONS
& ANSWERS(RATED A+)

What is the minimum compressive strength in psi for a concrete basement slab with
negligible weathering potential? - ANSWER2,500 PSI

An accessory structure is a structure not greater than _______ SF - ANSWER3,000
SF

What is the R Value insulation requirement for a residential floor climate zone 3? -
ANSWER19

For a "Means of Egress Door", what is the minimum width of each door opening in
inches? - ANSWER32''

Exterior wood framing walls shall be a minimum of _____ grade wood. - ANSWER3

Which of the following is not considered work exempt from a permit?
Swings/Playground equipment
Sidewalks
Fences less than 6ft
interior painting - ANSWERFences less than 6 ft

A permit becomes invalid if the work authorized by the permit does not begin in ____
days. - ANSWER180 days

True or False the building Permit should be kept onsite until work is complete? -
ANSWERTrue

When shall a final inspection be conducted? - ANSWERAfter permitted work is
complete.

Who appoints the building official from the department of building safety? -
ANSWERChief Appointing Authority of the Jurisdiction

When there is a conflict and different sections of the IBC specify different materials
you must? - ANSWERUse the most restrictive guidence

Live loads for floors and roofs must be posted by the owner when they exceed
_______PSF - ANSWER50 PSF


What is Required in a certificate of occupancy? - ANSWERName and Address of
Owner

, Name of Building Official
Edition of the code permit was issued under

Which is required on a site plan?
-location of new construction
- distance from lot lines
-traffic control plan
-location of existing structures - ANSWERTraffic Control Plan

How long must you retain approved construction documents after the work is
completed? - ANSWER180 days

Who is authorized to establish a refund policy for permit fees? - ANSWERBuilding
Official

True or False You are allowed to continue work safely after a stop work order has
been issued? - ANSWERFalse

A Permit is not valid until? - ANSWERThe fee has been paid

Who has the authority to authorize temporary utility connections? - ANSWERBuilding
Official

True or False A detached 400 Square Foot storage shed does not require a permit?
- ANSWERFalse

Footing and foundation inspections should occur? - ANSWERAfter excavation is
complete and Rebar is installed

What is the maximum slope of a ramp? - ANSWER12 to 1

A drill hole for piping or conduit shall be a minimum of ____ inches from the top to
the bottom of the floor joist - ANSWER1''

After the first coat is applied when should the second coat of cement plaster be
applied? - ANSWER48 hrs.

True or False Exhaust ducts associated with clothes dryers shall terminate outside of
the building - ANSWERTrue

Electrical Equipment intended to interrupt current at fault levels shall have a
minimum interrupting rate of ____ Amperes - ANSWER10,000 Amps

True or False All Metal faceplates should be grounded - ANSWERTrue

True or False Switching devices must be located less than 5 feet from the inside
walls of the pool. - ANSWERFalse

Información del documento

Subido en
8 de marzo de 2025
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
papersbyjol
3.8
(79)
Vendido
451
Seguidores
254
Artículos
14160
Última venta
1 semana hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes