OSHA lead allowable lead level
Give this one a try later!
40 ug/dl
What are the 3 stages a risk assesor counsles and educates owners/occupants
,Give this one a try later!
1. prior to risk assessment
2. after risk assessment but before control measure
3. after implemntation of control
What is the standard for field collection of dried paint samples for lead samples?
Give this one a try later!
ASTME 1729
Claims Insurance
Give this one a try later!
only covers you if your coverage is current
ASTME 1792
Give this one a try later!
ghost wipes
The number of blank needed
,Give this one a try later!
1 per unit or per site
Deteriorated paint
Give this one a try later!
any interior or exterior paint that is peeling, chipping, chalking, or cracking,
or is located on an interior or exterior surface or fixture that is damaged or
deteriorated
In a risk assessment screen what standard are used?
Give this one a try later!
half of the orginal
What six factors should a risk assesor review with an owner that will affect what kind
of evaluation is provided?
Give this one a try later!
, 1. legal/insurance requirement
2. property disposition
3. liability issues
4. preventative measures for children at risk
5. preventative measures prior to renovating or remodeling
6. response to child with EBL
minumum tests for window
Give this one a try later!
1 at least
HUD estimates how many homes contain lead-based paint?
Give this one a try later!
64 million
niosh bll of concern
Give this one a try later!
25 ug/dl
The need for XRF substrate correction depends on
Give this one a try later!
40 ug/dl
What are the 3 stages a risk assesor counsles and educates owners/occupants
,Give this one a try later!
1. prior to risk assessment
2. after risk assessment but before control measure
3. after implemntation of control
What is the standard for field collection of dried paint samples for lead samples?
Give this one a try later!
ASTME 1729
Claims Insurance
Give this one a try later!
only covers you if your coverage is current
ASTME 1792
Give this one a try later!
ghost wipes
The number of blank needed
,Give this one a try later!
1 per unit or per site
Deteriorated paint
Give this one a try later!
any interior or exterior paint that is peeling, chipping, chalking, or cracking,
or is located on an interior or exterior surface or fixture that is damaged or
deteriorated
In a risk assessment screen what standard are used?
Give this one a try later!
half of the orginal
What six factors should a risk assesor review with an owner that will affect what kind
of evaluation is provided?
Give this one a try later!
, 1. legal/insurance requirement
2. property disposition
3. liability issues
4. preventative measures for children at risk
5. preventative measures prior to renovating or remodeling
6. response to child with EBL
minumum tests for window
Give this one a try later!
1 at least
HUD estimates how many homes contain lead-based paint?
Give this one a try later!
64 million
niosh bll of concern
Give this one a try later!
25 ug/dl
The need for XRF substrate correction depends on