WGU Project Management - C722, UNIT 7 TEST questions with verified answers

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

___________________________ depend on project deliverables, project constraints, milestones, budgets, etc. Ans Task Relationships ______________________________ is the number of time periods required to finish work activities that lead to the completion of the project deliverables. Ans Duration ______________________________ occurs when the calculated completion date of the last project activity is later than the original targeted completion date. Ans Negtive Float ________________________________________ approaches are used when there is uncertainty in how long an activity will take Ans Probalistic duration estimation _______________activities are activities that can be performed simultaneously because they involve different resources. Ans Concurrent A _______________________ is when you start assigning dates based on the earliest start date, adding dates based on estimates for each task in the diagram. Ans forward pass

Vista previa del contenido

WGU Project Management - C722, UNIT 7 TEST
questions with verified answers
___________________________ depend on project deliverables, project
constraints, milestones, budgets, etc. Ans✓✓✓ Task Relationships


______________________________ is the number of time periods required to
finish work activities that lead to the completion of the project deliverables.
Ans✓✓✓ Duration


______________________________ occurs when the calculated completion date
of the last project activity is later than the original targeted completion date.
Ans✓✓✓ Negtive Float


________________________________________ approaches are used when
there is uncertainty in how long an activity will take Ans✓✓✓ Probalistic duration
estimation


_______________activities are activities that can be performed simultaneously
because they involve different resources. Ans✓✓✓ Concurrent


A _______________________ is when you start assigning dates based on the
earliest start date, adding dates based on estimates for each task in the diagram.
Ans✓✓✓ forward pass


As the project team develops the activity ____________________, they may
divide activities or identify additional activities that need to be added to the WBS.
Ans✓✓✓ duration estimates

, Between tasks you can insert _________________ to help shorten the overall
duration. Ans✓✓✓ Lead Time


Bringing in new resources as a means of __________________ in a project results
in additional build-in time to get up to speed. Ans✓✓✓ crashing costs


Decreasing ____________________ is possible by Inspecting tasks to see if they
can be made shorter. Ans✓✓✓ Critical Path


Inspecting tasks to see if they can be made shorter is one method for reducing
what?


Total float
Resources
Critical path
Functionality Ans✓✓✓ Critical path


Lead time or _____________________________extends a link backward or
forward so that the successor task starts earlier or later than it otherwise would.
Ans✓✓✓ lag time


The ___________________ used to complete project tasks can come from within
or outside of the organization hosting the project. Ans✓✓✓ Resources

Información del documento

Subido en
28 de febrero de 2025
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
cracker
3.8
(401)
Vendido
2175
Seguidores
1346
Artículos
50090
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes