WGU C722 Project Management questions with verified answer1.

Document preview thumbnail
Vista previa 4 fuera de 47 páginas

WGU C722 Project Management questions with verified answer1.

Vista previa del contenido

WGU C722 Project Management questions with
verified answers
Does a project always result in a new product or service? Ans✓✓✓ No. A project
may be undertaken to improve an existing product or service.


How are serial activities performed? Ans✓✓✓ In a single stream of tasks


How are the five steps organized? Ans✓✓✓ Chronologically across the life of the
project


How are the results of EV analysis used? Ans✓✓✓ To understand the current
state of the project and also to make predictions of what the budget performance
will be at project completion


How do probabilistic methods work? Ans✓✓✓ They use basic statistics to
account for uncertainty in activity duration estimates


How do profit/profitability based project selection models work? Ans✓✓✓ They
use some aspect of measuring the financial returns of the project relative to the
cost of the project or the time required to break-even


How does critical chain project management (CCPM) work? Ans✓✓✓ CCPM
assumes that resources available to complete the project are in limited supply
and it specifically plans to ensure resource availability. CCPM applies the theory of
constraints logic to project management by recognizing that the project can only
be completed if the resource (person, machine, capital, etc.) capacity is available.
In CCPM, the work each resource is expected to complete is checked to verify that
the resource will be capable and available when needed. Time buffers are built

,into the schedule to handle situations when the critical resources fall behind or
are not available.


How does the projectized organizational structure work? Ans✓✓✓ Subject
matter experts (SMEs) from different functional areas are assigned to directly
report to the project manager (PM) for a specific project. The SMEs report to the
PM for the duration of the project. At project conclusion, the SMEs report back to
their respective functional areas where they receive work assignments from the
functional manager until such time as they are reassigned to another project.


How is a set of criteria for a scoring model developed? Ans✓✓✓ Based on the
strategic objectives of the company


How is cost performance index (CPI) calculated? Ans✓✓✓ CPI = EV/AC


How is cost variance calculated? Ans✓✓✓ CV = EV − AC


How is estimate at completion calculated? Ans✓✓✓ EAC = AC + ETC


How is estimate to completion calculated? Ans✓✓✓ ETC = (BAC − EV)/CPI


How is PERT used? Ans✓✓✓ To estimate activity duration times; it uses a
statistical approach to estimate the time that will be required to complete project
work activities


How is schedule variance calculated? Ans✓✓✓ SV = EV − PV

,How is the activity estimate range calculated? Ans✓✓✓ Pessimistic estimate
minus optimistic estimate (P-O)


How is the activity estimate standard deviation calculated? Ans✓✓✓ Activity
estimate range (P-O) divided by six


How is the beta distribution calculated? Ans✓✓✓ Add the pessimistic estimate,
the optimistic estimate, and four times the most likely estimate; divide the result
by six


How is the payback period calculated? Ans✓✓✓ Estimated cost/monthly return
(estimated cost divided by monthly return)


How is the percent complete index calculated if the original baseline budget
stands? Ans✓✓✓ PCIB = EV/BAC


How is the percent complete index calculated when the customer has agreed to a
new budget at completion (BAC)? Ans✓✓✓ PCIC = AC/*EAC


How is the schedule performance index (SPI) calculated? Ans✓✓✓ SPI = EV/PV


How is the to complete performance index (TCPI) calculated? Ans✓✓✓ TCPI =
(BAC − EV)/(BAC − AC) if the project is under budget; TCPI = (BAC − EV)/(EAC − AC)
if the project is over budget


How is the triangular distribution/simple average determined? Ans✓✓✓ Add the
optimistic, most likely, and pessimistic estimates and divide by three

, How must criteria be answered in a scoring model for project selection?
Ans✓✓✓ With a scale


In project management, what is a duration? Ans✓✓✓ A term used to describe
the number of time periods required to complete some portion of the work


In project management, what is a stakeholder? Ans✓✓✓ Anyone who has an
impact on or is impacted by the project


In project management, what is a variance? Ans✓✓✓ A difference between
actual performance and the baseline scope


In project management, what term is used to describe connecting project
outcomes to company goals? Ans✓✓✓ Alignment


In which phase of the project life cycle does collecting customer requirements
occur? Ans✓✓✓ Planning phase


True/False: Checklists assign weights to each selection criterion? Ans✓✓✓ False


True/False: The functional organizational structure represents a traditional
hierarchy within a firm. Ans✓✓✓ True


Using the competitive necessity model, what is the decision to approve or
disapprove a project based on? Ans✓✓✓ Whether implementing the project will
ensure the viability of the company in the competitive market

Información del documento

Subido en
28 de febrero de 2025
Número de páginas
47
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
cracker
3.8
(401)
Vendido
2175
Seguidores
1346
Artículos
50090
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes