Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

ACQ Exam 1 Questions And Answers |Latest 2025 | Guaranteed Pass.

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 2:49PM A+ 1 ACQ Exam 1 Questions And Answers |Latest 2025 | Guaranteed Pass. What is the last activity in the Life Cylcle process - AnswerDisposal What are the responsibilities of the DACM - Answer1. Establish and monitor training requirements and DAWIA compliance 2. Certifies Dawia standards have been met What are the 3 Risk factors - AnswerCost, Performance, Schedule What is required for an Acquisition - AnswerAn Approved need Systems Engineering is responsible for - Answerintegration throughout the entire life cycle What is the GOV role in systems engineering - Answermanage the total program meet user needs translate operational need into a system performance specification When can technology be introduced into the life cycle - AnswerAt any point Is a critical Acquisition position higher or lower on the pay grade - AnswerHigher When does the JCIDS process occur - AnswerBefore the acquisition process What are the 3 steps to JCIDS methodology - AnswerCapabilities based assessment document of capability needs review validation and approval When is the Capabilities production Document (CPD) made - Answerin the engineering and manufacturing development phase for use at milestone C Whos is responsible for the budgeting phase of PPBE - AnswerThe Comptroller Whos is responsible for the planning phase of PPBE - AnswerUnderSecDefense ACAT ID - AnswerReview by defense Aqc Board (DAB) R@D 365m Pdn2.19b Chair USD ©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 2:49PM A+ 2 ACAT IC and II - AnswerArmy System Acq requirements council (ASARC) R@D 140m Pdn660m Chair ASALT ACAT III - AnswerIPR chair PEO What doc establishes thresholds of ACAT - AnswerDODI 5000.02 ACAT level enables identification of - AnswerType of system level of management applicable program reporting requirements Who is the milestone authority for CAT ID - AnswerUSD ATL how many phases in the life cycle model - Answer5 which phase is LRIP in - Answer4 production and deployment what are 2 reasons to initiate new technology - AnswerTake advantage of new technology react to an actual or potential threat Integrated Product and Process Development Integrated Product and Process Development (IPPD) is - Answeris a management approach that integrates all activities from product concept through production/deployment and support (Womb to Tomb) (IPPD)Utilizes multifunctional teams to optimize: - AnswerProduct Design Manufacturing Business Processes Sustainment Processes IPPD Benefits - AnswerReduced product delivery time Reduced product cost Reduced risk Improved quality Improved response to customer needs Program IPTs focus on - Answerthe day to day tasks Effective Team Member Characteristics - Answer.Support the team leader and other team members. .Provide functional area experti

Vista previa del contenido

©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 2:49PM A+




ACQ Exam 1 Questions And Answers |Latest
2025 | Guaranteed Pass.



What is the last activity in the Life Cylcle process - Answer✔Disposal

What are the responsibilities of the DACM - Answer✔1. Establish and monitor training
requirements and DAWIA compliance 2. Certifies Dawia standards have been met

What are the 3 Risk factors - Answer✔Cost, Performance, Schedule

What is required for an Acquisition - Answer✔An Approved need

Systems Engineering is responsible for - Answer✔integration throughout the entire life cycle

What is the GOV role in systems engineering - Answer✔manage the total program
meet user needs
translate operational need into a system performance specification

When can technology be introduced into the life cycle - Answer✔At any point

Is a critical Acquisition position higher or lower on the pay grade - Answer✔Higher

When does the JCIDS process occur - Answer✔Before the acquisition process

What are the 3 steps to JCIDS methodology - Answer✔Capabilities based assessment
document of capability needs
review validation and approval

When is the Capabilities production Document (CPD) made - Answer✔in the engineering and
manufacturing development phase for use at milestone C

Whos is responsible for the budgeting phase of PPBE - Answer✔The Comptroller

Whos is responsible for the planning phase of PPBE - Answer✔UnderSecDefense

ACAT ID - Answer✔Review by defense Aqc Board (DAB) R@D >365m Pdn>2.19b Chair USD


1

, ©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 2:49PM A+


ACAT IC and II - Answer✔Army System Acq requirements council (ASARC) R@D >140m
Pdn>660m Chair ASALT

ACAT III - Answer✔IPR chair PEO

What doc establishes thresholds of ACAT - Answer✔DODI 5000.02

ACAT level enables identification of - Answer✔Type of system
level of management
applicable program reporting requirements

Who is the milestone authority for CAT ID - Answer✔USD ATL

how many phases in the life cycle model - Answer✔5

which phase is LRIP in - Answer✔4 production and deployment

what are 2 reasons to initiate new technology - Answer✔Take advantage of new technology
react to an actual or potential threat
Integrated Product and Process Development Integrated Product and Process Development
(IPPD) is - Answer✔is a management approach that integrates all activities from product
concept through production/deployment and support (Womb to Tomb)

(IPPD)Utilizes multifunctional teams to optimize: - Answer✔Product Design
Manufacturing
Business Processes
Sustainment Processes

IPPD Benefits - Answer✔Reduced product delivery time
Reduced product cost
Reduced risk
Improved quality
Improved response to customer needs

Program IPTs focus on - Answer✔the day to day tasks

Effective Team Member Characteristics - Answer✔.Support the team leader and other team
members.
.Provide functional area expertise.

2

Información del documento

Subido en
25 de febrero de 2025
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TheStar
3.7
(140)
Vendido
710
Seguidores
178
Artículos
26803
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes