Examen

LEED v4 GA Practice Exam 100 Questions & Answers all correct.(2025)

Document preview thumbnail
Vista previa 3 fuera de 28 páginas

LEED v4 GA Practice Exam 100 Questions & Answers all correct.(2025)

Vista previa del contenido

LEED v4 GA Practice Exam 100 Questions & Answers all correct.(2025)

All of the following are part of the USGBC's policy regarding the use of their officially
registered logo, except:
A. The logo is provided by the USGBC
B. The logo may only refer to a USGBC program or product
C. The logo signifies endorsement by the USGBC
D. All uses of the logo must include a trademark, except when repeated logos in the same
document
E. The USGBC logo is less prominent in a document than the logo of the user - (ANSWER)C.
The logo signifies endorsement by the USGBC


A mixed use project is proposed吗?还是指某个特定的词或概念
with one story or level of residential apartments over ground
floor retail core and shell space.?
Which LEED rating system should the team use to certify the
project?
A. LEED Homes: Lowrise
B. LEED BD+C: New Construction
C. LEED BD+C: Core & Shell
D. LEED Neighborhood Development - (ANSWER)B. LEED BD+C: New Construction


The primary project team member responsible for managing the documentation for a project in
LEED Online is known as the _________________________.
A. LEED Project Analyst
B. LEED Project Assistant
C. LEED Project Ombudsman
D. LEED Project Administrator - (ANSWER)D. LEED Project Administrator


Which one of the following refers to a way of analyzing the environmental, social, and local
impact of a material or product?
A. Impact cycle assessment
B. Life cycle costs

,C. Life cycle assessment
D. Purchasing of ongoing consumables - (ANSWER)C. Life cycle assessment


Which of the following is not a rapidly renewable material?
A. Wool
B. Teak
C. Bamboo
D. Cork - (ANSWER)B. Teak


Buildings in the US account for what percent of total electricity use?
A. 55%
吗?还是指某个特定的词或概念
B. 68%
?
C. 72%
D. 80% - (ANSWER)C. 72%


Post-consumer recycled content is:________________.
A. Sourced from residential and commercial waste
B. Sourced from wholesale dealers
C. Sourced from manufacturing waste or by-products
D. Sourced from secondary market distributors - (ANSWER)A. Sourced from residential and
commercial waste


Buildings in the US account for what percent of municipal solid waste?
A. 60%
B. 55%
C. 45%
D. 30% - (ANSWER)D. 30%


Which one of the following defines nonpotable water?

, A. Water that meets drinking water standards
B. Water that does not meet drinking water standards
C. Greywater that has been treated on site to meet drinking water standards
D. Rainwater harvesting - (ANSWER)B. Water that does not meet drinking water standards


Which of the following are examples of pre-consumer recycled content products? (Select 3)
A. Concrete with fly ash from coal-fired power plants
B. Metal studs made from scrapped automobiles
C. Particle board made from old shipping pallets
D. Acoustical wall panel made with by-product from a plastic bottle manufacturing plant
E. Asphalt paving with reprocessed asphalt removed from old parking lot
吗?还是指某个特定的词或概念
F. Insulation made of scrap from denim jean manufacturing - (ANSWER)A, D, F
?
A. Concrete with fly ash from coal-fired power plants
D. Acoustical wall panel made with by-product from a plastic bottle
F. Insulation made of scrap from denim jean manufacturing


All of the following are typical elements of a Construction and Demolition Waste Management
Plan, except:
A. A waste diversion goal
B. Identification of types of waste to be generated during construction
C. An estimate of the total weight or volume of each type of waste to be generated during
construction
D. Identification of local resources for recycling and salvage of materials
E. Communication plan to increase participation by jobsite personnel - (ANSWER)C. An
estimate of the total weight or volume of each type of waste to be generated during
construction


A developer is proposing a new office building on a former industrial site less than 1/4 mile from
downtown, but a freeway separates the site from the restaurant and shopping district. In order to
improve the community connectivity of this project, the developer could:

Información del documento

Subido en
24 de febrero de 2025
Número de páginas
28
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$24.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StudyGiant
4.3
(71)
Vendido
7480
Seguidores
7
Artículos
3376
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes