100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

ECCC GE (Construction) STUDY GUIDE SUMMARY LATEST GUIDE.

Puntuación
-
Vendido
-
Páginas
17
Grado
A+
Subido en
11-02-2025
Escrito en
2024/2025

ECCC GE (Construction) STUDY GUIDE SUMMARY LATEST GUIDE.

Institución
ECCC GE
Grado
ECCC GE

Vista previa del contenido

ECCC GE (Construction) STUDY GUIDE
SUMMARY LATEST GUIDE.
Four types of airfield pavement system surface structures
-Semi prepared airfield (unsurfaced, in-place soils or improved subgrade or
surfaced, membrane surfaced, and mat-surfaced).
-Semi prepared airfield (aggregate-surfaced layered structure over
compacted subgrade).
-Surfaced airfield (flexible pavement or bituminous pavement).
Surfaced airfield (rigid pavement
Airfield: Membranes and Matting
· expedient ways to get more passes on soil that has a CBR of at least 5
· Heliport Categories: Initial
-might begin with an insertion of Engineers to clear (LZs) for individual aircraft
or LZs of opportunity.
Usage:
-Individual Aircraft
-LZ of opportunity
LZ expanded into Semi-prepared and Surfaced as require
· Heliport Categories: Initial
-Unsurfaced
-Located anywhere in T/O, mostly in areas that sustain close combat
-Little or no construction effort
-May not meet desired safety criteria
-Hazardous, inefficient and limited to good weather and visibility
-No estimated service life
· Heliport Categories: Assault Heliport

,-Service Life is 1-4 weeks
-Normally Semi-Prepared/Unsurfaced
-Designed for
-Observation aircraft
-Utility Aircraft
-Attack Aircraft
Area of Operations Heliport
-Service life is 1-6 months
-Semi-Prepared/Unsurfaced
-Variety of matting/membranes
-Designed for
-Observation aircraft
-Utility aircraft
-Attack aircraft
-Cargo aircraft
-Permit full efficiency of operations
-Greater safety than shaping area heliports
-Operations are practical under most weather conditions
Heliports
o Helipads
o Heliports with taxi hover lanes
o Heliports with runways
o Mixed Battalion heliports
· Airfield Damage Repair (ADR):
o Process: Gain Security, Assess Site, Clear Site, Mark Site, Prepare Site,
Repair Site using one of the techniques
Airfield Damage Repair: Debris Backfill Crater
-Used when debris is plentiful and suitable for filling crater.
-Fill crater with debris up to 18 inches below the surface.
-Fill remaining portion of the crater with crushed stone.

, Airfield Damage Repair: Choke Ballast Over Debris
-Used when debris is suitable for fill, but limited.
-Fill the crater with useable debris.
-Fill the remaining area with ballast rock 18 inches below the surface.
-Fill the remaining portion of the crater with crushed stone.
Airfield Damage Repair: Choke Ballast
-Used when water is standing in the crater or if subsurface material is
unsuitable for filling the crater
-Fill the crater with ballast rock up to 18 inches below the pavement surface
Fill the remaining portion of the crater with crushed stone
Airfield Damage Repair: Crushed Stone Repair Procedures
Clear the debris from around the crater at least 6 meters (20 feet) in all
directions
-ID and remove all upheaval
-Clear at least 20 feet outside the lip of the crater.
-Move the debris at least 30 feet off the MOS, and stockpile it no higher than
3 feet to prevent FOD
-Once edges of the crater are visible, measurements should be taken to
estimate the amount of fill material required and how many FRP panels will
be required to cover the repair.
Airfield Damage Repair: Sand Grid Repair
Airfield Damage Repair: Crushed Stone Repair Procedures Cont.
-Fill and compact the crater with crushed stone material, placing it in lifts
approximately 6 to 7 inches thick.
-For C-17 operations, limit the aggregate size to a maximum of 1 inch in the
top 6 inches of the crushed stone repair.
-Overfill the crater by approximately 3 inches above the original pavement
surface height.
-Compact each lift of crushed stone.
-Four passes of a single drum vibratory roller
-Two passes with a 10-ton vibratory roller.

Escuela, estudio y materia

Institución
ECCC GE
Grado
ECCC GE

Información del documento

Subido en
11 de febrero de 2025
Número de páginas
17
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$16.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
AcademicAllure stuvia
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
56
Miembro desde
1 año
Número de seguidores
11
Documentos
3079
Última venta
3 meses hace
MASTERMIND EDUCATIONAL WORLD IDEAS

Visit our store for the best, latest and verified study materials. Our goal is to help you achieve the best by offering Excellent and quality study materials to make your learning easy .Refer your friends also to benefit and don't forget to communicate with the seller for ORDER, PRE ORDER or any Assistant needed. WISHING YOU THE VERY BEST.

4.7

35 reseñas

5
29
4
2
3
3
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes