Answers correct
Who must be advised that a lockout/tag out procedure is going to be performed? -
answer Everyone involved, including the teacher
what has to be done before lockout/ tag out procedures can be implemented? - answer
Make sure everything is hooked up correctly and fastened down. Then, notify the
teacher and have him/her check your set up (Identification of hazards)
Ohm's Law is? - answer V=I*R or I=V/R or R=V/I
In a series circuit, voltages across the components add up to the voltage across the? -
answer applied voltage
In a parallel circuit, the components all have the (insert here) voltage across them. -
answer same
When using an Ohm meter voltage in the circuit should always be? - answer The
same as the applied voltage
In a series circuit, the (insert here) current flows in all parts. - answer full
In a parallel circuit, the currents in all the parallel branches add up to the current leaving
the? - answer applied voltage/ battery
A serious problem with Direct Numerical Control (NC) machines was that: - answer If
the computer fails, all the attached machines could fail to work.
The X, Y, and Z keys on the CNC Mill control keypad are used for which purposes? -
answer Set-up and calibration
In a PART program, G&M codes are - answer control or miscellaneous instructions
The basic purpose of a design or engineering drawing is to describe the - answer
exact dimensions and shape of an object
The files containing the production design and PART program should be - answer
replaced after testing is completed successfully
Which of the following is an advantage of using CAD software? - answer improved
filing and storing of designs