Temporary stabilization correct answers stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 5 types of plans correct answers 1. SWPPP 2. erosion and sed. plan (ESCP) 3. drainage plan/grading plan 4. spill prevention control and countermeasure plan (SPCC) 5. MS4 stormwater management plan/program (SWMP) SWPPP correct answers -required by NPDES for industrial, multi sector, and construction general permits -addresses operations that come in contact with stormwater and specific BMPs for reduction or elimination of discharges -site specific -identifies features, site activities and pollutants of concern Erosion & sediment control plan (ESCP) correct answers -a component of a construction permit -can sometimes be a part of an industrial permit (ex mining) -shows all required E&S controls; including design, placement, and details Drainage/ grading plans correct answers -a component of the swppp -is used for inspection of MS4 stormwater systems - sometimes combined with ESCP Spill Prevention Control and Countermeasures Plan correct answers -part of construction permit OR -part of industrial multi sector permit -may be included in MS4 permits (housekeeping) -details all spill prevention measures on site -details spill clean up -details training requirements of staff -details good housekeeping BMPs MS4 SMP correct answers -outline 6 minimum control measures for phase II municipalities -outlines all requirements of implementing a stormwater program for phase I municipalities or sites (ex. hospitals, universities, or POTWs) -details post construction inspection requirements, maintenance, pollution prevention, good housekeeping, IDDE inspections components of a plan correct answers -table of contents -ESC plan -certification -NOI

Vista previa del contenido

CESSWI 2 || A VERIFIED A+ PASS.
Temporary stabilization correct answers stone or plastic as a BMP to reduce erosion by
stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams

5 types of plans correct answers 1. SWPPP
2. erosion and sed. plan (ESCP)
3. drainage plan/grading plan
4. spill prevention control and countermeasure plan (SPCC)
5. MS4 stormwater management plan/program (SWMP)

SWPPP correct answers -required by NPDES for industrial, multi sector, and construction
general permits
-addresses operations that come in contact with stormwater and specific BMPs for reduction or
elimination of discharges
-site specific
-identifies features, site activities and pollutants of concern

Erosion & sediment control plan (ESCP) correct answers -a component of a construction permit
-can sometimes be a part of an industrial permit (ex mining)
-shows all required E&S controls; including design, placement, and details

Drainage/ grading plans correct answers -a component of the swppp
-is used for inspection of MS4 stormwater systems
- sometimes combined with ESCP

Spill Prevention Control and Countermeasures Plan correct answers -part of construction permit
OR
-part of industrial multi sector permit
-may be included in MS4 permits (housekeeping)
-details all spill prevention measures on site
-details spill clean up
-details training requirements of staff
-details good housekeeping BMPs

MS4 SMP correct answers -outline 6 minimum control measures for phase II municipalities
-outlines all requirements of implementing a stormwater program for phase I municipalities or
sites (ex. hospitals, universities, or POTWs)
-details post construction inspection requirements, maintenance, pollution prevention, good
housekeeping, IDDE inspections

components of a plan correct answers -table of contents
-ESC plan
-certification
-NOI

, -site specific info (soils, topography, utilities, limits of project, runoff coefficient, receiving
waters and quality, environmental assessment)
-project infor
-disturbed areas of the project
-scheduling of construction activities
-maintenance schedule of BMPs

A plan certification correct answers identifies the person or persons responsible for
implementation

pollutants of concern correct answers sediment, turbidity, hydrocarbons, biological, nutrients,
metals, pH

MS4 may list TMDL requirements for the following pollutants correct answers solid waste,
temperature, Haz waste, trash, construction material handling, organics

example of a visible pollutants correct answers sediment or turbidity

example of non-visible pollutant correct answers pH

Categories of BMPs correct answers -site planning and management (training/ scheduling)
-erosion control
-sediment control
-runoff control
-good housekeeping
-post construction

SWPPP amendments correct answers -changes in area of disturbance
-inadequate or additional BMPs
-new identified pollutants
-changes in drainage areas
-post- con BMP changes
-changes in project duration

Reportable Quantities of fuel/oil (NOT incl. gasoline) correct answers land- 25 gal
water- visible sheen

reporatable quantity of gasoline, antifreeze, battery acid, refrigerant, engine degreasers correct
answers air, land, water- 100lbs (13 gal)

termination of coverage qualifications correct answers -final stabilization achieved
-transfer of coverage
-for multi sector industrial "no exposure"

direction of sheet flow correct answers is always perpendicular to the contour lines

Información del documento

Subido en
6 de febrero de 2025
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
SirAnton
3.7
(118)
Vendido
810
Seguidores
438
Artículos
40068
Última venta
4 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes