100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

3rd Class Stationary Steam Engineer exam study guide with Q&A

Puntuación
-
Vendido
-
Páginas
22
Grado
A+
Subido en
05-02-2025
Escrito en
2024/2025

The 3rd Class Stationary Steam Engineer License Prep covers fundamental boiler operations, steam generation, safety protocols, and regulatory compliance. Key topics include thermodynamics, fuel systems, water treatment, pressure controls, and emergency shutdown procedures. This license is essential for operating and maintaining steam boilers in industrial settings. Study guides, test banks, flashcards, questions and answers, and notes are critical for mastering key concepts and passing the licensing exam.

Mostrar más Leer menos
Institución
3rd Class Stationary Steam Engineer
Grado
3rd Class Stationary Steam Engineer










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
3rd Class Stationary Steam Engineer
Grado
3rd Class Stationary Steam Engineer

Información del documento

Subido en
5 de febrero de 2025
Número de páginas
22
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

3rd class stationary steam engineer license prep
Study online at https://quizlet.com/_5iihvt

1. _________ are necessary for complete combus- time, temperature, mixture, and at-
tion omization

2. if the steam pressure gauge indicates 200 PSIG, 214.7
the absolute pressure is______

3. a boiler is operating at 400 PSI, and the safety 12
valve opens at 410 PSI and closes at 398 PSI.
The blowdown is______psi

4. an oil cooler is commonly used with a(n) steam turbine
________ when operating in conjunction with a
turbo-generator

5. a boiler is producing 40,000lb of steam/hr at a superheated
pressure of 100 PSI and a steam temperature of
500 degrees Fahrenheit. The steam produced is
_______ steam

6. the economizer on a boiler is used to _______ add heat to the feed water

7. blowers are normally used with________ boilers water tube

8. overheating of tubes on a boiler can be caused scale on tubes
by________

9. carbon dioxide in a condensate return system channeling
causes_________

10. a ________ pump is a positive displacement reciprocating
pump

11. a boiler generating 6000 lb of steam/hr pro- 6,000,000
duces _______btu/hr


, 3rd class stationary steam engineer license prep
Study online at https://quizlet.com/_5iihvt


12. a bottom blowdown is performed on a boiler to discharge sludge and sediment
_____

13. water columns are connected to the boiler with 1
a minimum of _______" pipe

14. the minimum size of a water column blowdown 3/4
valve is_______".

15. the maximum size bottom blowdown valve on 2 1/2
a boiler is_________".

16. a ________ allows condensate to pass through, a steam trap
but stops Steam.

17. when taking over a shift, the first thing to do is water level in each boiler
check the________

18. according to the asme code, a high-pressure two or more safety valves
boiler having more than 500 square feet of
heating surface shall have________

19. the probable cause of an increase in tempera- dirty heating services
ture of gases of combustion at the boiler Outlet
is____

20. boilers in battery equipped with________ must manhole openings
have two main steam stop valves and a
free-flowing drain between them

21. in order to be sure the gauge glass is indicating blowdown the gauge glass
an accurate water level reading, the stationary
engineer should______



, 3rd class stationary steam engineer license prep
Study online at https://quizlet.com/_5iihvt

22. a continuous blowdown line is located___ in the Steam and water drum well
below the nowl

23. a temperature reading of 80 degrees Celsius is 176
equal to_________°f

24. a chimney temperature of 250 degrees Fahren- poor efficiency
heit above steam temperature indicates_______

25. a manometer is red in________ inches of water

26. the boiling point of water will____ with an in- be raised
crease in pressure

27. if a lather is not obtained when performing a hard
soap hardness test, the water sample is_______

28. combustion efficiency can be increased when preheated
air is________

29. ______ draft is produced by a fan located be- induced
tween the boiler and the chimney

30. the overspeed trip on a steam turbine should before putting the steam turbine
be tested ______ on-line

31. a high CO2 reading in the gases of combustion High combustion efficiency
is a sign of____

32. the purpose of chemically treating feedwater is turn scale-forming salts to a non ad-
to________ hering sludge

33. water in a d rating feed water heater is prevent- Loop seal or internal overflow
ed from entering the steam line by a(n) _______.
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ThePlug Liberty University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
64
Miembro desde
1 año
Número de seguidores
2
Documentos
6461
Última venta
4 días hace
ThePlug

My store seeks to solve the challenge most students and professional scholars go through on a daily basis. Access to quality learning and revision materials! Finding the right learning materials for revision or to help meet that A+ grade for your courses is our main goal and objective. Engage us and we will ensure you are satisfied and the process is easy and seamless!

3.6

17 reseñas

5
7
4
3
3
4
2
0
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes