100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PJM Generator Operator ACE 100% Verified

Puntuación
-
Vendido
-
Páginas
1
Grado
A+
Subido en
22-01-2025
Escrito en
2024/2025

Area Control Error (ACE) - ANSWER A measure of the imbalance between sources of power and uses of power within the PJM RTO. The instantaneous difference between a Balancing Authority's net actual and scheduled interchange, taking into account the effects of Frequency Bias, correction for meter error, and Automatic Time Error Correction (ATEC), if operating in the ATEC mode. The sign convention for power flow used at PJM is _________ for power flow into PJM; the NERC sign convention is power flow into a balancing area is ________. - ANSWER Positive; Negative Flat Tie Line Control - ANSWER Utilizes

Mostrar más Leer menos
Institución
PJM Generation
Grado
PJM Generation








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM Generation
Grado
PJM Generation

Información del documento

Subido en
22 de enero de 2025
Número de páginas
1
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PJM Generator Operator ACE 100%
Verified
Area Control Error (ACE) - ANSWER A measure of the imbalance between sources of
power and uses of power within the PJM RTO. The instantaneous difference between a
Balancing Authority's net actual and scheduled interchange, taking into account the
effects of Frequency Bias, correction for meter error, and Automatic Time Error
Correction (ATEC), if operating in the ATEC mode.

The sign convention for power flow used at PJM is _________ for power flow into PJM;
the NERC sign convention is power flow into a balancing area is ________. - ANSWER
Positive; Negative
Flat Tie Line Control - ANSWER Utilizes only interconnection tie line flow as the
controlling parameter; only responds to net tie flow deviations; limited to special
circumstances when PJM Balancing Area desires to maintain a given net interchange
flow and frequency is stabled and being controlled by other Balancing Areas

Tie Line Bias Control - ANSWER Responds to both frequency and net tie line flow
deviations

There are three modes of ACE Control available to PJM dispatcher for the operation of
the PJM RTO. - ANSWER Flat Frequency Control; Flat Tie Line Control; Tie Line Bias
Control

Flat Frequency Control - ANSWER Utilizes only power system frequency as the
controlling parameter; only responds to frequency deviations and does not adjust
operations for any interconnection tie line schedule deviations; only applicable when
PJM Balancing area becomes isolated from the Easter Interconnection


The frequency bias factor for the PJM RTO is set by Interconnection Agreement that is
at least 1% of the yearly peak value and accomplishes: - ANSWER -compensates for
automatic governor action so ACE does not "undo" changes in generator output due to
frequency fluctuations; compensates for any lack of PJM governor response by
calculating an ACE that produces the PJM RTO's agreed upon share of frequency
support to the Easter Interconnection
$9.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lecchris West Virgina University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
40
Miembro desde
2 año
Número de seguidores
15
Documentos
3203
Última venta
2 semanas hace
LECCHRIS

3.8

6 reseñas

5
2
4
1
3
3
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes