Week 6 Practicum Project: Verification
Worksheet
Directions: In the Survey Results, use this worksheet to calculate your
Practicum Project PRE-survey results and POST-survey results. In Analysis of
Surveys, analyze the data by answering the questions.
Name: Date:
Survey Results
1. Practicum project topic: Depression
2. Date(s) of meeting(s) 8/7/2024, 8/11/2024
3. Tables of results: Calculate the results of your surveys and place the
numerical values in the boxes below.
Example:
Strongly Neither Strongly
#
Agree Agree Agree or Disagree Disagree Disagree
1 1 2 1 0 0
PRE-Survey
Strongly Neither Strongly
# Disagree
Agree Agree Agree or Disagree Disagree
1 0 0 1 0 0
2 0 1 0 0 0
3 0 0 0 1 0
4 0 0 1 0 0
5
6
7
8
© 2023. Chamberlain University LLC. All rights
07/202 reserved.
3
Worksheet
Directions: In the Survey Results, use this worksheet to calculate your
Practicum Project PRE-survey results and POST-survey results. In Analysis of
Surveys, analyze the data by answering the questions.
Name: Date:
Survey Results
1. Practicum project topic: Depression
2. Date(s) of meeting(s) 8/7/2024, 8/11/2024
3. Tables of results: Calculate the results of your surveys and place the
numerical values in the boxes below.
Example:
Strongly Neither Strongly
#
Agree Agree Agree or Disagree Disagree Disagree
1 1 2 1 0 0
PRE-Survey
Strongly Neither Strongly
# Disagree
Agree Agree Agree or Disagree Disagree
1 0 0 1 0 0
2 0 1 0 0 0
3 0 0 0 1 0
4 0 0 1 0 0
5
6
7
8
© 2023. Chamberlain University LLC. All rights
07/202 reserved.
3