Examen

Final Estimates Level 2| Exam Questions Solved 100% Correct | Verified Solutions

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

Final Estimates Level 2| Exam Questions Solved 100% Correct | Verified Solutions

Vista previa del contenido

Final Estimates Level 2| Exam Questions Solved
100% Correct | Verified Solutions

Why is it important to run a progress estimate soon after Final Acceptance? - ✔✔So
the estimate can be paid through EED quickly to prevent interest.


On Financial Project No.000101-1-52-01, which is a conventional project, the notice to
proceed is dated December 1, 2015 and the contract time is to start 16 days after the
Notice to Proceed per the contract. The Contractor begins work on December 18, 2015
and the project is Final Accepted on December 31, 2015. There are no added weather or
other reasons. What is the 1st chargeable day and how many total days should be
recorded in the Contract Time File? - ✔✔12/17/2015 with 15 chargeable days.


On Lump Sum Contracts, upon Final Acceptance, the Project Administrator will send? -
✔✔The Offer of Final Payment



Field Records for multiple jobs, same contract, should be kept? - ✔✔In seperate Field
Books & In seperate files within Project Solve and EDMS


On Lump Sum Project, A Superpave Asphalt Course item requires a Composite Pay
Factor (CPF) adjustment. What is the total dollar adjustment amount?
Lot 1 with 2000 Tons and a CPF of 0.99
Lot 2 with 4000 Tons and CPF of 0.99
Lot 3 with 4000 Tons and CPF of 1.00

Lot 4 with 4000 Tons and a CPF of 1.00 - ✔✔$5425.20


Under the current Specifications for Lump Sum Projects, the Project Administrator will
approve and pay the Final Estimate? - ✔✔False

, Original Terrain line sections: - ✔✔A)Represent the terrain prior to Contruction
B) Are necessary to establish earthwork quantities
C) Must be shown on cross sections.
ALL OF THE ABOVE


The plans show the designer calculations for Clearing & Grubbing with a total of 3.2
Acres to be cleared and grubbed. During the Construction, a plan error was encountered
which required the clearing and grubbing of an additional 800 SY. This required an
adjustment to the original Lump Sum Pay Item. Calculate the adjusted Final Pay
Quantity. The secondary unit is in Acres not SY. Note 1 Acre= 4840 SY:
Pay Item= Clearing and grubbing

Original Quantity = 1.0 Lump Sum - ✔✔3.2 Ac x 4840 SY= 15488 SY
15488 + 800 SY = 16288 SY
16288 SY/15488 SY = 1.052 Lump Sum



The Prime Contractor is required to certify previous payments for? - ✔✔1st tier
Subcontractors and Suppliers



Borrow Excavation is paid for as a? - ✔✔Final Measurement


When should Liquidated Damages be reflected on a progress estimate? -
✔✔(**Begins after Contract time runs out up to the estimate cut off date. Liquidated
Damages are withheld monthly.)
ON SUBSEQUENT PROGRESS REPORTS


Final Measurements are to be documented on which of the following? -
✔✔A)Miscellaneous Forms

Información del documento

Subido en
13 de enero de 2025
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
QUINTER
3.6
(73)
Vendido
420
Seguidores
105
Artículos
39867
Última venta
2 semanas hace


Reseñas de compradores verificados




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes